X-LOTUS-CHARSET:UTF-8
VERSION:3.0
PRODID:-//Lotus Development Corporation//NONSGML Notes 8.5.2//EN_C
FN:George H Dilintas/GRC/VERITAS
N:Dilintas;George;;;
ADR;TYPE=WORK;TYPE=PREF:PIRAEUS;;23\, Etolikoy Str.;PIRAEUS;;185 45
;GREECE
ADR;TYPE=HOME;TYPE=PREF:;;19-21 B. Laskou str.;Athens;Attika;11 633
;Greece
TEL;TYPE=HOME:+30-1-7667 197
TEL;TYPE=WORK:+30-210-40 63 113
TEL;TYPE=HOME;TYPE=FAX:+30 - 1 - 7667 197
TEL;TYPE=WORK;TYPE=FAX:+30-210-40 63 118
TEL;TYPE=CELL:+30 -69 44-64 62 04
EMAIL;TYPE=WORK;TYPE=PREF;TYPE=INTERNET
:george.dilintas@gr.bureauveritas.com
ORG:Bureau Veritas;Industry
REV:20131201T024559Z
END:VCARD
Generally we consider as repair any intervention after final V.I / NDE.
If the welder himself is "adjusting" the weld appearance, this is not considered a repair
- best regards
Dr. Georgios Dilintas
Authorized Nuclear Inspector
Authorized Inspector Supervisor
I&F REGIONAL TECHNICAL MANAGER
BUREAU VERITAS HELLAS
Tel: +30 210 40 63 113/4
Fax: +30 210 40 63 118
Cell: +30 69 44 64 62 04
(See attached file: Dilintas_George.vcf)
---03/12/2014 05:44:37---Hello Nandesh, Continuing the subject, you mention that -
From: <Vijay.Tayade@akersolutions.com>
To: <materials-welding@googlegroups.com>
Date: 03/12/2014 05:44
Subject: RE: [MW:22436] Grinding or filling is allowed on Final pass (on capping) for WPQT ? Urgent plse..
Sent by: materials-welding@googlegroups.com
Hello Nandesh,
Continuing the subject, you mention that -
Filing a completed weld for good visual appearance, is not a problem, I think.
Consider a situation where Fatigue Grinding is required on production welding. The joint is visual and NDT Tested and accepted with all examination.
However during grinding due to poor grinding skill, it is excavated more than requirement and results in lesser wall thickness.
Is this case shall be consider as "repair welding" There is no issue with the welding however it is now require to be "re-weld" or refill of cap.
Provide your view.
Best regards,
Vijay Tayade
Welding Engineer | Materials Technology
Aker Solutions
Tel: +91 20 6691 8929 (60 18929) | Mob: +91 9960599789
vijay.tayade@akersolutions.com | www.akersolutions.com
Aker Powergas Subsea Pvt Ltd
Visiting address: IT-2 Blue Ridge SEZ, Hinjewadi, 411057 Pune, India
Registered in India, CIN : U74990MH2010PTC210736
From: materials-welding@googlegroups.com [mailto:materials-welding@googlegroups.com] On Behalf Of Nandesh Kumar
Sent: Friday, December 28, 2012 2:34 PM
To: materials-welding@googlegroups.com
Subject: Re: [MW:16356] Grinding or filling is allowed on Final pass (on capping) for WPQT ? Urgent plse..
ASME Sec IX do not address this issue. As far as I know, the only code which allows grinding of completed welds is AWS D1.5 - 2002 (Bridge Welding Code) See Clause 3.2.2.1, 2nd para, Point # 4. (4) grinding the completed weld smooth and flush with the adjacent surface to produce a workmanlike finish (see 3.6.3). Further, 3.6.3 says : Unless otherwise approved by the Engineer, all reinforcement shall be removed where the weld forms a part of a faying surface. Any reinforcement shall blend smoothly into the plate surfaces with transition areas free from weld edge undercut. Chipping may be used, provided it is followed by grinding. IMO, grinding of the completed welds should be applicable only for ( including as suggested by C Sridhar) removing sharp notches, bulbous contours, overlaps only with prior approval and presence of concerned Inspector/Engineer, especially qualification welds. No welder should be allowed to grind the completed welds on their own, as they make it mess sometimes. I have seen welders try to "remove" external undercuts by grinding the base metal and bringing it to the level of surface of undercut, which may reduce the minimum specified wall thickness of the base metal. Filing a completed weld for good visual appearance, is not a problem, I think. I'm also waiting for opinion of the experts of this forum. ವಂದನೆಗಳೊಂದಿಗೆ / Best regards, P.S. : Please don't print this e-mail unless you really need to.
Mr. Sathis kumar,
Codes do not specify about the grinding & filling, on not only final but even in filler passes. It is the discrepancy of the Inspection authority who witnesses the test. Some allow it while few do not. They feel it is lack of skill on the part of the welder concerned if he is allowed to grind such surface defect.
But, it need not be a fact. Say if it is a surface pore due to sudden breeze or to other reasons where welder is not at fault, he takes the Inspector into confidence to remove such defects by grinding or other means. So it is a selective thinking.
More attention is given in initial visual inspection for root defects like. LP, LF, UC, Ex. Penetration , Oxidation (in TIG process), Cavities, under flush etc., than on surface defects on cap runs.
Sridhar. From: Sathish Kumar <sathishbemech@gmail.com> To: materials-welding@googlegroups.com Sent: Thursday, 27 December 2012 2:37 PM Subject: [MW:16349] Grinding or filling is allowed on Final pass (on capping) for WPQT ? Urgent plse..
Dear Experts, Thanks in advance..
Regards --
-- |
To post to this group, send email to materials-welding@googlegroups.com
To unsubscribe from this group, send email to materials-welding+unsubscribe@googlegroups.com
For more options, visit this group's bolg at http://materials-welding.blogspot.com/
http://www.linkedin.com/groups/MaterialsWelding-122787?home=&gid=122787&trk=anet_ug_hm
The views expressed/exchnaged in this group are members personel views and meant for educational purposes only, Users must take their own decisions w.r.t. applicable code/standard/contract documents.
This e-mail and any attachment are confidential and may be privileged or otherwise protected from disclosure. It is solely intended for the person(s) named above. If you are not the intended recipient, any reading, use, disclosure, copying or distribution of all or parts of this e-mail or associated attachments is strictly prohibited. If you are not an intended recipient, please notify the sender immediately by replying to this message or by telephone and delete this e-mail and any attachments permanently from your system.
--
To post to this group, send email to materials-welding@googlegroups.com
To unsubscribe from this group, send email to materials-welding+unsubscribe@googlegroups.com
For more options, visit this group's bolg at http://materials-welding.blogspot.com/
http://www.linkedin.com/groups/MaterialsWelding-122787?home=&gid=122787&trk=anet_ug_hm
The views expressed/exchnaged in this group are members personel views and meant for educational purposes only, Users must take their own decisions w.r.t. applicable code/standard/contract documents.
---
You received this message because you are subscribed to the Google Groups "Materials & Welding" group.
To unsubscribe from this group and stop receiving emails from it, send an email to materials-welding+unsubscribe@googlegroups.com.
For more options, visit https://groups.google.com/d/optout.
This message contains confidential information. To know more, please click on the following link: http://disclaimer.bureauveritas.com
No comments:
Post a Comment