what material is it? in case original weld is PWHT'ed , need to repeat PWHT and required NDE. 

On 23 December 2014 at 08:26, 'Karthik' via Materials & Welding <materials-welding@googlegroups.com> wrote:
Hi,
Since yave done all NDT on this joint and you found defect after that will be considered as a "Repair welding". You open a NCR and You can do repair on that area and confirm by suitable NDT and close the NCR.
 
Thanks & Regards,

(Karthik)

Karthikeyan.S
QA / QC Manager
German-Thai Boiler Engineering Cooperation Limited.
Rayong Factory;
379 Moo.6 Soi 8, Tambol Pananikom,.
Nikompattana, Rayong 21180 THAILAND
Tel: +66 38 897 035-9 Ext. 137
Hand Phone: 0066 892512282


On Monday, December 22, 2014 4:26 PM, "Vijay.Tayade@akersolutions.com" <Vijay.Tayade@akersolutions.com> wrote:.


Hello Sir,
Sorry for diverting from The Welder Qualification subject to Production welding.
Can You Put light on Below please question -.
Consider a situation where Fatigue Grinding is required on production welding. The joint is visual and NDT Tested and accepted with all examination.
However during grinding due to poor grinding skill, it is excavated more than requirement and results in lesser wall thickness.
Is this case shall be consider as "repair welding"? Or welding parameter as per original WPS are allowed to be used for welding three new bead and meet the required wall thickness.
Pipe Wall thickness is 24.4mm,
 
 
Best regards,
Vijay Tayade
Welding Engineer | Materials Technology
Aker Solutions.
 
Tel: +91 20 6691 8929 ( 60 18929)  | Mob: +91 9960599789
Vijay.tayade@akersolutions.com   |   Www.akersolutions.com
 
Aker Subsea Powergas Pvt Ltd
Visiting address: IT-2 Blue Ridge SEZ, Hinjewadi, Pune 411057,. India
Registered in India, CIN: U74990MH2010PTC210736.

 
 
 
From: Materials-welding@googlegroups.com [mailto: Materials-welding@googlegroups.com] On Behalf Of George.dilintas@gr.bureauveritas.com Sent: Wednesday, December 03, 2014 7:52 PM To: materials-welding @. googlegroups.com Subject: RE: [MW: 22447] Grinding or Filling is allowed on Final Pass (on capping) for WPQT? Urgent plse ..


 
As we generally consider any Repair Intervention After Final VI / NDE.
If The welder himself is "Adjusting" The WELD appearance, this is Not considered a Repair.
best regards Dr. Georgios Dilintas Authorized Nuclear Inspector Authorized Inspector Supervisor I & F REGIONAL TECHNICAL MANAGER BUREAU VERITAS HELLAS Tel: +30 210 40 63 113/4 Fax: +30 210 40 63 118 Cell: +30 69 44 64 62 04













(See attached file: Dilintas_George.vcf. )

12.3.2014 5:44:37 --- --- Hello Nandesh, Continuing The subject, You mention that -

From: < Vijay.Tayade@akersolutions.com >
To: < Materials-welding@googlegroups.com >
Date. : 03.12.2014 5:44
Subject: RE: [MW: 22436] Grinding or Filling is allowed on Final Pass (on capping) for WPQT? Plse urgent ..
Sent by: Materials-welding@googlegroups.com.




Hello Nandesh,
Continuing the subject, you mention that -.
Filing a completed weld for good visual appearance, is not a problem, I think.
Consider a situation where Fatigue Grinding is required on production welding. The joint is visual and NDT Tested and accepted with all examination.
However during grinding due to poor grinding skill, it is excavated more than requirement and results in lesser wall thickness.
 
Is this case shall be consider as "repair welding" There is no issue with the welding however it is now require to be "re-weld" or refill of cap.
 
Provide your view.
 
 
 
Best regards,
Vijay Tayade

Welding Engineer | Materials Technology
Aker Solutions.
 
Tel: +91 20 6691 8929 ( 60 18929)  | Mob: +91 9960599789
Vijay.tayade@akersolutions.com   |   Www.akersolutions.com

Aker Subsea Powergas Pvt Ltd

Visiting address: IT-2 Blue Ridge SEZ, Hinjewadi, Pune 411057,. India
Registered in India, CIN: U74990MH2010PTC210736.


 
 
From:  Materials-welding@googlegroups.com [ mailto: Materials-welding@googlegroups.com ] On Behalf Of Nandesh Kumar
Sent:
 Friday, December 28, in 2012 two thirty-four PM
To:
 Materials-welding@googlegroups.com
Subject:
 Re:. [MW: 16356] Grinding or filling is allowed on Final pass (on capping) for WPQT? Urgent plse ..
 
Not ASME Sec IX do address this Issue. As Far As I know, The only code which allows grinding of welds is completed AWS D1.5 - 2002nd (Bridge Welding Postnummer) See Clause 3.2.2.1, 2nd Para, Point # 4. (. 4) The completed WELD Smooth grinding and Flush with The surface adjacent to Produce a liable Finish (See 3.6.3). Further, 3.6.3 says:  Unless otherwise approved by The Engineer, all Reinforcement Shall be removed Where The WELD forms a Part. of a faying surface. Reinforcement any Shall smoothly Blend Into The Plate surfaces with transition areas free from WELD EDGE undercut. Chipping May be Used, Provided it is followed by grinding. IMO, grinding of The completed welds should be applicable only for (including As SUGGESTED by C Sridhar) removing sharp notches, Bulbous Contours, overlaps only with Prior Approval and Presence of Concerned Inspector /. engineer, especially Qualification welds. No welder should be allowed to Grind The completed welds on their own, As they Mess Make it sometimes. I Have seen welders TRY to "Remove" external undercuts by grinding The Base Metal and Bringing it to The Level of surface of undercut, which May Reduce The Minimum specified Wall Thickness of The Base Metal. Filing a completed WELD for good Visual appearance, is. Not a problem, I Think. I'm also Waiting for The Opinion of Experts of this Forum.  


 


 









ವಂದನೆಗಳೊಂದಿಗೆ /  Best regards, Nandesh Kumar A Abu Dhabi, UAE.

 

PS: Please do not print this e-mail unless you really need to.


--- On Thu, 27/12/12, C Sridhar < Sridhar305@yahoo.com >  wrote:.

From: C Sridhar < Sridhar305@yahoo.com >
Subject: Re: [MW: 16353] Grinding or Filling is allowed on Final Pass (on capping) for WPQT? Plse urgent ..
To: " Materials-welding@googlegroups.com "< Materials-welding@googlegroups.com >
Date: Thursday, 27 December, in 2012, four forty-three PM.
Mr. Sathis kumar,
 
Codes do not specify about the grinding & filling, on not only final but even in filler passes. It is the discrepancy
of the Inspection authority who witnesses the test. Some allow it while few do not. They feel it is lack of skill on the part of the welder concerned if he is allowed to grind such surface defect.
 
But, it need not be a fact. Say if it is a surface pore due to sudden breeze or to other reasons where welder is not at fault, he takes the Inspector into confidence to remove such defects by grinding or other means. So it is a selective thinking.
 
More attention is given in initial visual inspection for root defects like. LP, LF, UC, Ex. Penetration, Oxidation (in TIG process), Cavities, under flush etc., than on surface defects on cap runs.
 
Sridhar.
 


From:  Sathish Kumar < Sathishbemech@gmail.com >
To:
 
Materials-welding@googlegroups.com 
Sent:
 Thursday, 27 December 2 012 two thirty-seven PM
Subject:
 [MW: 16349] Grinding or Filling is allowed on Final Pass (on capping). for WPQT? Urgent plse ..
 
Dear Experts,
Please Advice.
Whether or Filling Grinding is allowed on Final Pass (on capping) for Welder Performance Qualification test (WPQT) for Plate or Pipe. Since Qualification is done based on ASME Sec 9, So I Need As Per ASME Sec 9 reference only.
Also I referred Already ASME Sec 9 - QW194, which only Mentions The Complete Joint penetration for Visual Examination for WPQT. But it is more Not Specific in Case of Grinding or Filling and also some Other (Acceptable limits?) Parameters like Reinforcement, undercut, underfill etc ..
I Need reference only Asme Sec 9, Because As Per The project contract is only Asme Sec 9. applicable for our project in Case of WPQT.
Advice please guys ..
Thanks in advance ..
 
Regards
Sathish. K
Welding inspector.
Jubail, Saudi arabia.
-

--
To post to this group, send email to materials-welding@googlegroups.com
To unsubscribe from this group, send email to materials-welding+unsubscribe@googlegroups.com
For more options, visit this group's bolg at http://materials-welding.blogspot.com/
http://www.linkedin.com/groups/MaterialsWelding-122787?home=&gid=122787&trk=anet_ug_hm
 
The views expressed/exchnaged in this group are members personel views and meant for educational purposes only, Users must take their own decisions w.r.t. applicable code/standard/contract documents.
---
You received this message because you are subscribed to the Google Groups "Materials & Welding" group.
To unsubscribe from this group and stop receiving emails from it, send an email to materials-welding+unsubscribe@googlegroups.com.
For more options, visit https://groups.google.com/d/optout.

Comments

Popular posts from this blog

Materails FAQs

Q: What are equivalents for standard Q 235 B (and Q 235 A) for U-channels? (asked by: boris.vielhaber@vait.com) A: DIN Nr. = 2393 T.2, 2394 T.2, EN 10025 W. Nr. DIN 17007 = 1.0038 Design DIN 17006 = RSt 37-2, S235JRG2 (Fe 360 B) Q: What is St DIN 2391 BK material? (asked by: dmcandrews@automaticstamp.com) A: Precision steel tubes, cold-finished/hard. Q: What is C.D.W. Boiler Tube? (asked by: montydude123@yahoo.com) A: Cold Drawn Welded Boiler Tube. Q: WHAT IS W.Nr. 1.4301? PLS TELL US IN EASY LANGUAGUE (asked...

Heat tint (temper) colours on stainless steel surfaces heated in air // Heat tint

Introduction The colour formed when stainless steel is heated, either in a furnace application or in the heat affected zone of welds, is dependent on several factors that are related to the oxidation resistance of the steel. The heat tint or temper colour formed is caused by the progressive thickening of the surface oxide layer and so, as temperature is increased, the colours change.   Oxidation resistance of stainless steels However, there are several factors that affect the degree of colour change and so there is no a single table of colour and temperature that represents all cases. The colours formed can only be used as an indication of the temperature to which the steel has been heated. Factors affecting the heat tint colours formed Steel composition The chromium content is the most important single factor affecting oxidation resistance. The higher the chromium, the more heat resistant the steel and so the development of the heat tint colou...

Re: [MW:10788] ON PLOT PIPING & OFF PLOT PIPING

Piping systems involved for the flow lines and gathering lines from the well head isolation valve to the production facility or processing plant isolation valve are determined as OFF PLOT. ON PLOT defines piping system in the processing plant and production platform. ANSI/ASME B31.4 applies for off plot piping system. B31.4 allows the use of either API 1104 or ASME section IX (as appropriate). However, occasionally, a very small system such as piping within 500 feet of a processing plant (some client also said 400 feet) may be declared B31.3 rather than B31.4. When B31.3 is invoked, only ASME Section IX is used. before you decide which code to use for welding procedure and/or welder qualification for pipe welding, you have to know the design and construction code applicable to the system. Please read far enough into scope and diagram illustrating the application of either B31.3 and B31.4 hope this helps rgds 2011/4/21 pradip kumar sil < pradipsil@gmail.com > Dear all, ...