dear sir
aramco project what is the essential check while pipe material receving.it is entire sceneiriea different there is any reference what kind of documents need to verfied in aramco project regarding material receving.
thanks regards
R.PARTHASARATHY
sarathyramasubbu@gmail.com
--
https://materials-welding.blogspot.com/
https://www.linkedin.com/groups/122787
---
You received this message because you are subscribed to the Google Groups "Materials & Welding" group.
To unsubscribe from this group and stop receiving emails from it, send an email to materials-welding+unsubscribe@googlegroups.com.
Visit this group at https://groups.google.com/group/materials-welding.
For more options, visit https://groups.google.com/d/optout.
Subscribe to:
Post Comments (Atom)
Re: [MW:35374] Material Certification 3.1 / 3.2/2.2--EIL India
Dear Perumal, I answer the same but got one more question where it is written that TPI witness is mandatory? -- https://materials-...
-
Q: What are equivalents for standard Q 235 B (and Q 235 A) for U-channels? ...
-
Definition of buttering from ASME Section IX, QW/QB-492 Definitions: Buttering: the addition of material, by welding, on one or bot...
-
Section I. PRINT READING 3-1. GENERAL a. Drawings . Drawing or sketching is a universal language used to convey all necessary information to...
No comments:
Post a Comment