[MW:18342] Tack welding,bridge tack welding,requirement of welder if above 16inch


Dear Expert,

Construction Code B31.3

Question 1:

Why the tack welding to be done in the groove with piece of "glit",where it is mentioned in code?



Question 2:

Is it acceptable for bridge tack with different material but same P number?



Question 3:

Before in one project we usually use 2 welder for 16" pipe.This one where it has mentioned in code?

Question 4:

Root & hot pass welding done by GTAW with one welder(he is qualified GTAW&SMAW) & Final and cap with 2 welder/both sides (SMAW process qualified pipe welder) Is it acceptable?













--
Thanks&Regards
Kumar

--
To post to this group, send email to materials-welding@googlegroups.com
To unsubscribe from this group, send email to materials-welding+unsubscribe@googlegroups.com
For more options, visit this group's bolg at http://materials-welding.blogspot.com/
http://www.linkedin.com/groups/MaterialsWelding-122787?home=&gid=122787&trk=anet_ug_hm
 
The views expressed/exchnaged in this group are members personel views and meant for educational purposes only, Users must take their own decisions w.r.t. applicable code/standard/contract documents.
---
You received this message because you are subscribed to the Google Groups "Materials & Welding" group.
To unsubscribe from this group and stop receiving emails from it, send an email to materials-welding+unsubscribe@googlegroups.com.
For more options, visit https://groups.google.com/groups/opt_out.
 
 

No comments:

Re: [MW:35374] Material Certification 3.1 / 3.2/2.2--EIL India

Dear Perumal, I answer the same but got one more question where it is written that TPI witness is mandatory? -- https://materials-...