Dear Mr.Thomas.,
Re a/m subject. Regarding the PWHT:
1. it is either based on the standard you are using as API 650 general
requirement as in relation to thickness and material type and grad or as
special conditions : internal material is lethal or the subject ligament
will be under sever stresses regardless of thickness. Which also affect
the intensity of RT.
2. Yes you can do localize PWHT but you need a specialized capable team
and equipments most preferable in my opinion using gas heaters with
recordable chart readers.
Best rgrds
D.eng.A.Aziz Gendia
ecco-spi President & CEO
Mob.: +2012 21 33 956
Fax: +202 2477 8411
e-mail: ecco-spi@gmail.com
-----Original Message-----
From: materials-welding@googlegroups.com
[mailto:materials-welding@googlegroups.com] On Behalf Of thocho37
Sent: Thursday, May 31, 2012 7:19 AM
To: Materials & Welding
Subject: [MW:14426] Tank Clean out door PWHT
Hi, Can any one tell whether I can carry out PWHT of clean out door welding
after erection of first shell course?
We have erected the clean out door section of the shell plate and completed
vertical welding without performing the PWHT. As per API 650, it needs to be
completed PWHT regardless of thickness before assembly(erection).
if that is the case, I have to cut the joint and do the PWHT and reweld
again.Can I do PWHT at site after erection?
If not, any one explain me what is the reason behind it. Why API is
insisting to have PWHT before erection.
Cheers,
Thomas
--
To post to this group, send email to materials-welding@googlegroups.com
To unsubscribe from this group, send email to
materials-welding+unsubscribe@googlegroups.com
For more options, visit this group's bolg at
http://materials-welding.blogspot.com/
The views expressed/exchnaged in this group are members personel views and
meant for educational purposes only, Users must take their own decisions
w.r.t. applicable code/standard/contract documents.
--
To post to this group, send email to materials-welding@googlegroups.com
To unsubscribe from this group, send email to materials-welding+unsubscribe@googlegroups.com
For more options, visit this group's bolg at http://materials-welding.blogspot.com/
The views expressed/exchnaged in this group are members personel views and meant for educational purposes only, Users must take their own decisions w.r.t. applicable code/standard/contract documents.
Subscribe to:
Post Comments (Atom)
Re: [MW:35289] Welding consumable for S355J2WP material
S355 J2 WP is a weathering structural steel It has better atmospheric corrosion resistance. Use E 8018 - W1/W2 Electrodes This is regular...
-
Q: What are equivalents for standard Q 235 B (and Q 235 A) for U-channels? ...
-
Definition of buttering from ASME Section IX, QW/QB-492 Definitions: Buttering: the addition of material, by welding, on one or bot...
-
Section I. PRINT READING 3-1. GENERAL a. Drawings . Drawing or sketching is a universal language used to convey all necessary information to...
No comments:
Post a Comment