Monday, December 20, 2010

Re: [MW:8830] WQT

Gents,
yes,we can proceed as per ASME SEC IX if radiography is cleared.
 
thanks and regards
Sujay
 


 
On Mon, Dec 20, 2010 at 7:48 AM, Rishikesh Singh <01hrishi@gmail.com> wrote:
Dear Sirs,

I want to know that in welder qualification test if the NDT is cleared and the Destructive testing is awaited then can we start our production weld with these welders and what happen in case  the Destructive examination is failed please reply Sir i m suffering with this problem please.

Regards,
 
Rishikesh Singh
Project Engineer(Bharuch)
A.I.P.L.
8128769028

--
To post to this group, send email to materials-welding@googlegroups.com
To unsubscribe from this group, send email to materials-welding+unsubscribe@googlegroups.com
For more options, visit this group's bolg at http://materials-welding.blogspot.com/
The views expressed/exchnaged in this group are members personel views and meant for educational purposes only, Users must take their own decisions w.r.t. applicable code/standard/contract documents.

--
To post to this group, send email to materials-welding@googlegroups.com
To unsubscribe from this group, send email to materials-welding+unsubscribe@googlegroups.com
For more options, visit this group's bolg at http://materials-welding.blogspot.com/
The views expressed/exchnaged in this group are members personel views and meant for educational purposes only, Users must take their own decisions w.r.t. applicable code/standard/contract documents.

No comments:

Re: [MW:35289] Welding consumable for S355J2WP material

S355 J2 WP  is a weathering structural steel  It has better atmospheric corrosion resistance. Use E 8018 - W1/W2  Electrodes This is regular...