Augustin,

thanks

I read before that ...the client due the complexity of 1" traced oil hot line....is worry if the water will not realise completely from system will happen an incident so ...they propose to substitute hydrostatic with pneumatic ....maximum operation pressure is 2 bars ...so we wants to do the pneumatic test at 6 or 8 bars ...means 300-400% over the max operat. pressure....and also in the same time ...soup test ....bubble test....

i am just confused about the restriction for pneumatic test ...i know that for pressure vessels are completely avoid .....

daniel


On Tue, Sep 8, 2009 at 4:14 PM, AGUSTIN JIMENEZ <agumarca@yahoo.com> wrote:
Hi Daniel.
ASME B31.4
-Piping systems that at some point will operate in an effort
circumferential greater than 20% of minimum yield strength
specified, shall be subjected to a hydrostatic test of 1.25 times the
design internal pressure of the pipe at that point, considering the
external pressure of the water column at that point (foot of water / 2.31
lbs/pul2). The minimum duration is 4 hours. 
- At no time efforts that are induced during the test
hydrostatic exceed the effort for 90% of point
minimum yield strength of material. If this occurs, the pressure
test should be reduced to the maximum pressure to which the effort
produced by hydrostatic testing does not exceed 90% of the yield strength
of pipe to the test temperature.
- The maximum test pressure to which the effort produced by the test
Hydrostatic not exceed 90% of yield stress of pipe material
can be calculated with the following equation:
Pm = Sy x 1.8 t/D + Pe
Where:
Pm = Maximum test pressure
Sy = specified minimum yield limit
t = thickness of the pipe
D = Outside diameter of pipe
Pe = Pressure of the water column (foot of water / 2.31 lbs/pulg2)
- A hydrostatic or pneumatic test can be used for systems
pipeline that will operate at a circumferential stress of 20% or less of
specified minimum yield strength. The test pressure shall not be less
1.25 times the design internal pressure (considering the external pressure
by effects of water column). If a pneumatic test, it
will be 0.689 MPa (100 Lbs/pulg2) or that an effort to produce
circumferential equal to 25% of specified minimum yield strength of the
pipe, whichever is the lesser. Test time will be longer
specified above.
 
Excuse if my English is not good
 
Agustin Jimenez



De: daniel iordache <daniel.iordache@gmail.com>
Para: materials-welding@googlegroups.com
Enviado: martes, 8 de septiembre, 2009 2:26:52
Asunto: [MW:3137] hot-oil traced line

hello Friends
 
we have in project 10-12" bitumen line .......these lines are accompanied by hot-oil traced line 1" sch 40....maximum pressure for those line are 30 psi.....due the complexity of network ....i want to test line instead of hydrostatic ...pneumatic at 90 psi ... ....there is any restriction..? Most of people said is avoid to do pneumatic test ...by code ....i did not find any ....
 
please advice

--
Daniel Iordache
Bureau Veritas - Angola
Mechanical& Welding Surveyor
Mobile Ao: +244921544583
Mobile Ro:   +40721731728
E-Mail: daniel.iordache@gmail.com
          daniel_iordache@yahoo.com




¡Obtén la mejor experiencia en la web!
Descarga gratis el nuevo Internet Explorer 8
http://downloads.yahoo.com/ieak8/?l=e1





--
Daniel Iordache
Bureau Veritas - Angola
Mechanical& Welding Surveyor
Mobile Ao: +244921544583
Mobile Ro:   +40721731728
E-Mail: daniel.iordache@gmail.com
          daniel_iordache@yahoo.com


--~--~---------~--~----~------------~-------~--~----~
To post to this group, send email to materials-welding@googlegroups.com
To unsubscribe from this group, send email to materials-welding-unsubscribe@googlegroups.com
For more options, visit this group's bolg at http://materials-welding.blogspot.com/
The views expressed/exchnaged in this group are members personel views and meant for educational purposes only, Users must take their own decisions w.r.t. applicable code/standard/contract documents.
-~----------~----~----~----~------~----~------~--~---

Comments

Popular posts from this blog

Materails FAQs

Q: What are equivalents for standard Q 235 B (and Q 235 A) for U-channels? (asked by: boris.vielhaber@vait.com) A: DIN Nr. = 2393 T.2, 2394 T.2, EN 10025 W. Nr. DIN 17007 = 1.0038 Design DIN 17006 = RSt 37-2, S235JRG2 (Fe 360 B) Q: What is St DIN 2391 BK material? (asked by: dmcandrews@automaticstamp.com) A: Precision steel tubes, cold-finished/hard. Q: What is C.D.W. Boiler Tube? (asked by: montydude123@yahoo.com) A: Cold Drawn Welded Boiler Tube. Q: WHAT IS W.Nr. 1.4301? PLS TELL US IN EASY LANGUAGUE (asked...

Heat tint (temper) colours on stainless steel surfaces heated in air // Heat tint

Introduction The colour formed when stainless steel is heated, either in a furnace application or in the heat affected zone of welds, is dependent on several factors that are related to the oxidation resistance of the steel. The heat tint or temper colour formed is caused by the progressive thickening of the surface oxide layer and so, as temperature is increased, the colours change.   Oxidation resistance of stainless steels However, there are several factors that affect the degree of colour change and so there is no a single table of colour and temperature that represents all cases. The colours formed can only be used as an indication of the temperature to which the steel has been heated. Factors affecting the heat tint colours formed Steel composition The chromium content is the most important single factor affecting oxidation resistance. The higher the chromium, the more heat resistant the steel and so the development of the heat tint colou...

Re: [MW:10788] ON PLOT PIPING & OFF PLOT PIPING

Piping systems involved for the flow lines and gathering lines from the well head isolation valve to the production facility or processing plant isolation valve are determined as OFF PLOT. ON PLOT defines piping system in the processing plant and production platform. ANSI/ASME B31.4 applies for off plot piping system. B31.4 allows the use of either API 1104 or ASME section IX (as appropriate). However, occasionally, a very small system such as piping within 500 feet of a processing plant (some client also said 400 feet) may be declared B31.3 rather than B31.4. When B31.3 is invoked, only ASME Section IX is used. before you decide which code to use for welding procedure and/or welder qualification for pipe welding, you have to know the design and construction code applicable to the system. Please read far enough into scope and diagram illustrating the application of either B31.3 and B31.4 hope this helps rgds 2011/4/21 pradip kumar sil < pradipsil@gmail.com > Dear all, ...