See UW-12(e)
On Mon, Mar 16, 2020 at 3:39 AM chiluka venkatramulu <ramuluchiluka@gmail.com> wrote:
Dear All,--Pl clarify the below requirement.If welded pipe required in U-stamp job, is the pipe manufacturer should have U-stamp certification?. Such material must be furnished with a Code PartialData Report for Welded Construction (Form U-2 or U-2A)?Thanks & Regards,Venkatramulu CH
https://materials-welding.blogspot.com/
https://www.linkedin.com/groups/122787
---
You received this message because you are subscribed to the Google Groups "Materials & Welding" group.
To unsubscribe from this group and stop receiving emails from it, send an email to materials-welding+unsubscribe@googlegroups.com.
To view this discussion on the web visit https://groups.google.com/d/msgid/materials-welding/CAF98%2BdHm2ve87wD_F_KN6usSXo%2Bfe4OLA-Ozqig6Hdo%3DNYBbMw%40mail.gmail.com.
https://materials-welding.blogspot.com/
https://www.linkedin.com/groups/122787
---
You received this message because you are subscribed to the Google Groups "Materials & Welding" group.
To unsubscribe from this group and stop receiving emails from it, send an email to materials-welding+unsubscribe@googlegroups.com.
To view this discussion on the web visit https://groups.google.com/d/msgid/materials-welding/CAGta9%3DsqE4%3DdTtY4pqGu8pNfaYVB9YrWiV4C5oU9W2nNCP8k-g%40mail.gmail.com.
No comments:
Post a Comment