Wednesday, October 10, 2018

Re: [MW:28415] Distance between two L-Seam

When the vessel is 100% RT than long seam can be at same line ? 100 radiographed on each c seam is consider when RT for vessel is spot? So it's mean when spot RT is there in vessel than only we have to maintain 5 T criteria for long seam setup.because ASME code use word "EXCEPT "- means remains the other.

--
https://materials-welding.blogspot.com/
https://www.linkedin.com/groups/122787
---
You received this message because you are subscribed to the Google Groups "Materials & Welding" group.
To unsubscribe from this group and stop receiving emails from it, send an email to materials-welding+unsubscribe@googlegroups.com.
Visit this group at https://groups.google.com/group/materials-welding.
For more options, visit https://groups.google.com/d/optout.

No comments:

Re: [MW:35289] Welding consumable for S355J2WP material

S355 J2 WP  is a weathering structural steel  It has better atmospheric corrosion resistance. Use E 8018 - W1/W2  Electrodes This is regular...