RE: [MW:13809] Post Weld heat treatment & No of thermocouples regarding

Hi Eswaran,
 
These two are the important among the applicable clauses for local PWHT. As stated here and as required a as a part of the quality documentations a PWHT procedure is required.It should include as a minimum requirement the following:-
  1. mode of heating   
  2. ramp rates(both heating and cooling)
  3. recommended PWHT time and temperature, Item 1,2,3 should be as per the design code
  4. no of  thermocouples required, location, width of the heating band etc(one may follow AWS D-10.10) as a default standard.
If the client has a written procedure , one should follow that. In case of  a  technical conflict , AWS D-10.10 may also  be referred.
 
Thanks.
 

Pradip Goswami,P.Eng.IWE

Welding & Metallurgical Specialist & Consultant

Ontario, Canada.

Email-pgoswami@sympatico.ca,

pgoswami@quickclic.net

 

6.3.3.4 Post-weld heat treatment — Local heating Local post-weld heat treatment shall consist of heating a circumferential band around the weld at a temperature within the range specified in the qualified WPS. The minimum width of the controlled band at each side of the weld on the face of the greatest weld width shall be the thickness of the weld or 50 mm (2 in) from the weld edge, whichever is less. Heating by direct flame impingement on the material shall not be permitted.

6.3.2.6 Post-weld heat treatment Post-weld heat treatment shall be in accordance with the applicable qualified WPS. Welds may be locally post-weld heat-treated. The manufacturer shall specify procedures for the use of local postweld heat treatment.



From: materials-welding@googlegroups.com [mailto:materials-welding@googlegroups.com] On Behalf Of K.Babu
Sent: Friday, March 02, 2012 9:07 AM
To: materials-welding@googlegroups.com
Subject: Re: [MW:13808] Post Weld heat treatment & No of thermocouples regarding

Hi
 
We need to refer client spec for this job.
 
VG, Cameron got their own spec for PWHT.
 


 
On Fri, Mar 2, 2012 at 2:28 PM, Eswaran samikannu <eswaranaws@yahoo.co.in> wrote:
Good day to all,
 
We are one of the authorised repairing & Manufacturer  of OEM Cameron, VG & Shaffer BOP and riser pipes , I want to know thermocouples location / No of thermocouples vs Pipe size according to API 6A /API 16A for localaised stress relief (PWHT), Any one have the standards let me know or inform where i can get the information.
 
Thanks
S.Eswaran 

--
To post to this group, send email to materials-welding@googlegroups.com
To unsubscribe from this group, send email to materials-welding+unsubscribe@googlegroups.com
For more options, visit this group's bolg at http://materials-welding.blogspot.com/
The views expressed/exchnaged in this group are members personel views and meant for educational purposes only, Users must take their own decisions w.r.t. applicable code/standard/contract documents.



--
Thanks & regards,

K.Babu

--
To post to this group, send email to materials-welding@googlegroups.com
To unsubscribe from this group, send email to materials-welding+unsubscribe@googlegroups.com
For more options, visit this group's bolg at http://materials-welding.blogspot.com/
The views expressed/exchnaged in this group are members personel views and meant for educational purposes only, Users must take their own decisions w.r.t. applicable code/standard/contract documents.