gag and plug using to block PRV during the hydrotest.
Saygılarımla, / Best Regards,
Eyup Tan
Mobile: +90 535 334 4912
On Thu, Apr 4, 2019 at 8:17 AM 'Mac Palola' via Materials & Welding <materials-welding@googlegroups.com> wrote:
Dear Sirs,--Do we have any basis on ASME that PRV in test manifold is required during hydrotest?Thank you.Best Regards,Mac Palola
https://materials-welding.blogspot.com/
https://www.linkedin.com/groups/122787
---
You received this message because you are subscribed to the Google Groups "Materials & Welding" group.
To unsubscribe from this group and stop receiving emails from it, send an email to materials-welding+unsubscribe@googlegroups.com.
Visit this group at https://groups.google.com/group/materials-welding.
For more options, visit https://groups.google.com/d/optout.
https://materials-welding.blogspot.com/
https://www.linkedin.com/groups/122787
---
You received this message because you are subscribed to the Google Groups "Materials & Welding" group.
To unsubscribe from this group and stop receiving emails from it, send an email to materials-welding+unsubscribe@googlegroups.com.
Visit this group at https://groups.google.com/group/materials-welding.
For more options, visit https://groups.google.com/d/optout.
No comments:
Post a Comment