Dear Experts,Tank Material - Group 1Diameter of Tank - 15 metersInspection Recommendation - Replacement of Annular Plate wherever thickness loss observed. Mostly 70% Area will be replaced. Currently the Full Bottom Plate replacement is not feasible.Configuration of Weld Joint - Single Butt welded joint with backing strip for the Annular Plate joint.Query 1: Whether Radiography will be required for the butt welded joint as per API 650, Section 8.1.2.9?Query 2: If RT will be required and if it is not possible, whether UT can be taken.Hope to see the response with respect to Code and request specific answer against both the queries.Thank youRegards, Vino
http://www.linkedin.com/groups/MaterialsWelding-122787?home=&gid=122787&trk=anet_ug_hm
The views expressed/exchnaged in this group are members personel views and meant for educational purposes only, Users must take their own decisions w.r.t. applicable code/standard/contract documents.
---
You received this message because you are subscribed to the Google Groups "Materials & Welding" group.
To unsubscribe from this group and stop receiving emails from it, send an email to materials-welding+unsubscribe@googlegroups.com.
To post to this group, send email to materials-welding@googlegroups.com.
To view this discussion on the web visit https://groups.google.com/d/msgid/materials-welding/CAM7oz7DNAxWAd4Q9N-7OdcnK3auwHC6gPOaNsr2YYXMJ0qtoqg%40mail.gmail.com.
For more options, visit https://groups.google.com/d/optout.
No comments:
Post a Comment