[MW:14165] RE: 14154] PWHT OF P 91 ALLOY STEEL MATERIAL.

-----Original Message-----
From: John Henning
Sent: 27/04/2012, 6:42 pm
To: materials-welding@googlegroups.com
Subject: [MW:14158] RE: 14154] PWHT OF P 91 ALLOY STEEL MATERIAL.


Stress corrosion cracking has been noted in as welded 91 material when
it has been wetted. The concern is that the welds may have dew
formation, or in some way be exposed to water. 91 in the as welded
condition should be held indoors in temperature and/ humidity controlled
conditions. An alternative is to keep in indoor storage but with the
welded material maintained at a temperature above the expected dew point
(by electric resistance pads most likely). The seven day thing is bit
arbitrary and my personal take is that it is just to make sure that PWHT
is performed in a timely manner. My experience with large amounts of
welded 91 is that there has been no cracking even after extended time (a
couple of months) in the as welded condition but we hold all as welded
91 in climate controlled conditions. I have not seen any empirical
evidence that 7 days, 14 days, or 30 days makes any difference provided
storage conditions are appropriate.



Note that function of the preheating and post heating you are doing is
to prevent hydrogen assisted cracking. The preheat and post heat allow
hydrogen to diffuse out of the material. Entirely different worry than
SCC in the presence of water.



Also note that any water; pure or otherwise has been demonstrated to
allow SCC in as welded 91 and it only needs be a film of water.



John A. Henning

Welding & Materials



From: materials-welding@googlegroups.com
[mailto:materials-welding@googlegroups.com] On Behalf Of manoj john
Sent: Thursday, April 26, 2012 3:24 AM
To: materials-welding@googlegroups.com
Subject: [MW:14154] PWHT OF P 91 ALLOY STEEL MATERIAL.



Dear All,



We are going to do P91 piping fabrication, as per client
specification the stroage time after welding is limited to maximum 7
days for PWHT. Is there any problem if it delays 10 days when we are
following preheating procedure for welding as mentioned below:



Preheat at 200 degree C. Min. 300 degree C. Max.

Inter pass temperature 250 to 300 degree C.

Cooling 20 to 80 degree C. after wleding

Post heating (extended heating) after cooling 300 degree C.

for four hours or 400 degree C. for three hours.



Thanks in advance for your response.\



Manoj.



--
To post to this group, send email to materials-welding@googlegroups.com
To unsubscribe from this group, send email to
materials-welding+unsubscribe@googlegroups.com
For more options, visit this group's bolg at
http://materials-welding.blogspot.com/
The views expressed/exchnaged in this group are members personel views
and meant for educational purposes only, Users must take their own
decisions w.r.t. applicable code/standard/contract documents.


______________________________________________________________________
The information in this email is confidential, and is intended solely for the addressee(s). If you are not the intended recipient of this email please let us know by reply and then delete it from your system; you should not copy this message or disclose its contents to anyone. The internet can not guarantee the integrity of this message. HAMON (and its subsidiaries) shall (will) not therefore be liable for the message if modified.
______________________________________________________________________

--
To post to this group, send email to materials-welding@googlegroups.com
To unsubscribe from this group, send email to materials-welding+unsubscribe@googlegroups.com
For more options, visit this group's bolg at http://materials-welding.blogspot.com/
The views expressed/exchnaged in this group are members personel views and meant for educational purposes only, Users must take their own decisions w.r.t. applicable code/standard/contract documents.

--
To post to this group, send email to materials-welding@googlegroups.com
To unsubscribe from this group, send email to materials-welding+unsubscribe@googlegroups.com
For more options, visit this group's bolg at http://materials-welding.blogspot.com/
The views expressed/exchnaged in this group are members personel views and meant for educational purposes only, Users must take their own decisions w.r.t. applicable code/standard/contract documents.

Comments

Popular posts from this blog

Materails FAQs

Q: What are equivalents for standard Q 235 B (and Q 235 A) for U-channels? (asked by: boris.vielhaber@vait.com) A: DIN Nr. = 2393 T.2, 2394 T.2, EN 10025 W. Nr. DIN 17007 = 1.0038 Design DIN 17006 = RSt 37-2, S235JRG2 (Fe 360 B) Q: What is St DIN 2391 BK material? (asked by: dmcandrews@automaticstamp.com) A: Precision steel tubes, cold-finished/hard. Q: What is C.D.W. Boiler Tube? (asked by: montydude123@yahoo.com) A: Cold Drawn Welded Boiler Tube. Q: WHAT IS W.Nr. 1.4301? PLS TELL US IN EASY LANGUAGUE (asked...

Heat tint (temper) colours on stainless steel surfaces heated in air // Heat tint

Introduction The colour formed when stainless steel is heated, either in a furnace application or in the heat affected zone of welds, is dependent on several factors that are related to the oxidation resistance of the steel. The heat tint or temper colour formed is caused by the progressive thickening of the surface oxide layer and so, as temperature is increased, the colours change.   Oxidation resistance of stainless steels However, there are several factors that affect the degree of colour change and so there is no a single table of colour and temperature that represents all cases. The colours formed can only be used as an indication of the temperature to which the steel has been heated. Factors affecting the heat tint colours formed Steel composition The chromium content is the most important single factor affecting oxidation resistance. The higher the chromium, the more heat resistant the steel and so the development of the heat tint colou...

Re: [MW:10788] ON PLOT PIPING & OFF PLOT PIPING

Piping systems involved for the flow lines and gathering lines from the well head isolation valve to the production facility or processing plant isolation valve are determined as OFF PLOT. ON PLOT defines piping system in the processing plant and production platform. ANSI/ASME B31.4 applies for off plot piping system. B31.4 allows the use of either API 1104 or ASME section IX (as appropriate). However, occasionally, a very small system such as piping within 500 feet of a processing plant (some client also said 400 feet) may be declared B31.3 rather than B31.4. When B31.3 is invoked, only ASME Section IX is used. before you decide which code to use for welding procedure and/or welder qualification for pipe welding, you have to know the design and construction code applicable to the system. Please read far enough into scope and diagram illustrating the application of either B31.3 and B31.4 hope this helps rgds 2011/4/21 pradip kumar sil < pradipsil@gmail.com > Dear all, ...