RE: [MW:9956] Change in sequence of PWHT cycle

Dear JJ,

 

Can you please state purpose of these two different PWHT cycles?

 

It seems that first cycle (660 - 640 °C for 2 hrs) is for intermediate stress relief (ISR) after welding and second cycle (687 °C for 8 hrs) is for final PWHT. 

If these two cycles are ISR & final PWHT, ISR shall be done immediately after welding.

 

Regarding effect of PWHT, any heating above 480 °C is considered to have effect on mechanical properties of metal (reduction in yield strength and tensile strength).

Irrespective of the sequence of PWHT / heating cycles, total effect on mechanical properties will be same. Total effect on tensile properties is calculated by finding the "Holloman Parameter (HP)" for each individual cycle and then adding together. For more information, see below links from Dillinger web site.

 

http://www.dillinger.de/hollomon/help.shtml.en 

 

http://www.dillinger.de/hollomon/examples_js.shtml.en

 

Regards,

 

 

Santosh Latake

 


From: materials-welding@googlegroups.com [materials-welding@googlegroups.com] on behalf of joshi jaydeep [jaydeep.p.joshi@gmail.com]
Sent: Saturday, February 19, 2011 11:41 AM
To: materials-welding@googlegroups.com
Subject: [MW:9941] Change in sequence of PWHT cycle

Dear all,
 
 
I have and PWHT cycle of 600-640 Deg C for 2 Hrs followed by 687 Deg C for 8 Hrs.
 
will it make any difference in any of the properties of WM &/or BM if I change the sequence of PWHT cycle i.e.first cycle of PWHT for 687 for 8Hrs followed by 600-640 for 2 Hrs?
 
Material: LAS
 
regards,
 
JJ
 
 

--
To post to this group, send email to materials-welding@googlegroups.com
To unsubscribe from this group, send email to materials-welding+unsubscribe@googlegroups.com
For more options, visit this group's bolg at http://materials-welding.blogspot.com/
The views expressed/exchnaged in this group are members personel views and meant for educational purposes only, Users must take their own decisions w.r.t. applicable code/standard/contract documents.

Comments

Popular posts from this blog

Materails FAQs

Q: What are equivalents for standard Q 235 B (and Q 235 A) for U-channels? (asked by: boris.vielhaber@vait.com) A: DIN Nr. = 2393 T.2, 2394 T.2, EN 10025 W. Nr. DIN 17007 = 1.0038 Design DIN 17006 = RSt 37-2, S235JRG2 (Fe 360 B) Q: What is St DIN 2391 BK material? (asked by: dmcandrews@automaticstamp.com) A: Precision steel tubes, cold-finished/hard. Q: What is C.D.W. Boiler Tube? (asked by: montydude123@yahoo.com) A: Cold Drawn Welded Boiler Tube. Q: WHAT IS W.Nr. 1.4301? PLS TELL US IN EASY LANGUAGUE (asked...

[MW:36169] Cold Bending Qualification

Dear Experts,  Can anyone share the inspection requirements or a qualification procedure for cold bending? Our client spec states only the requirements for induction bending and would like to know your opinion on the cold bend inspection requirements. The code of construction is B31.3, Max. 5D bends, A106 SS 316L.  Thanks in Advance. -- https://materials-welding.blogspot.com/ https://www.linkedin.com/groups/122787 --- You received this message because you are subscribed to the Google Groups "Materials & Welding" group. To unsubscribe from this group and stop receiving emails from it, send an email to materials-welding+unsubscribe@googlegroups.com . To view this discussion visit https://groups.google.com/d/msgid/materials-welding/1be61cc3-e9c9-4a5f-834d-e8485e248432n%40googlegroups.com .

[MW:30043] Weep hole

If weep hole is not provided in dummy pipe before welding What will happen??? -- https://materials-welding.blogspot.com/ https://www.linkedin.com/groups/122787 --- You received this message because you are subscribed to the Google Groups "Materials & Welding" group. To unsubscribe from this group and stop receiving emails from it, send an email to materials-welding+unsubscribe@googlegroups.com . To view this discussion on the web visit https://groups.google.com/d/msgid/materials-welding/da251ee6-fa7f-4851-b876-cdb3834ae341%40googlegroups.com .