do you need it for B31.1 or B31.3? pl. refer above interpretation # 5-23, may also find similar interpretations in #2-6, and 3-10
Interpretation:
5-23Subject: ANSI/ASME 831, Hydrotest Preparation
Date issued: June 11, 1987
File: B3 1-86-033
Question: May all joints, including welds, used in piping systems covered by ANSI/ASME B31.1,
ANSI/ASME 831.3, ASME/ANSI 831.4, ANSI/ASME 831.8, ANSi/ASME B31.9, and ANSI/ASME
831.1
1 be primed and painted prior to hydrotest?Reply: Yes.
From: pgoswami@sympatico.ca [mailto:pgoswami@sympatico.ca]
Sent: Tuesday, December 01, 2009 12:53 AM
To: materials-welding@googlegroups.com; daniel.iordache@gmail.com
Subject: FW: [MW:3773] hydrotest b31.1
I attached the interpretation of B-31.3 code on the issue of painting before hydrotest:-
- In ASME, B-31.3-2006 Clause 345.3.1 specifies, All joints, welds (including
structural attachment welds to pressure-containing components),and bonds shall be left uninsulated and exposed for examination during leak testing, except that joints previously tested in accordance with this Code may be insulated or covered.
- All joints may be primed and painted prior to leak testing unless a sensitive leak
test is required. The word may is suggestive not mandatory.
- However the best practice for painting ,before or after hydrotest may be mutually resolved with client, depending on the interest of the project.
- Painting before hydro test may involve double and redundtant work.Especially if the defect is detected on a painted surface during hydro test.area to be repaired would require the paint to be stripped and repainted after successful repair.
I hope this would clarify the issue. Appreciate inputs from the others.
Thanks.
Pradip Goswami,P.Eng
Senior Engineer/Specialist(Welding-Metallurgy)
Component Integrity Dept.
Engineering & Training Services Division
ONTARIO POWER GENERATION Inc.
PO Box-2000, RR-55(South)
Nanticoke, Ontario,N0A1L0
Tel:-(519) 587-2201, Ext 3107--in Nanticoke
(416) 231-4111, Ext 5925--in Kipling,Toronto
Fax: (519) 587-6814
Date: Mon, 30 Nov 2009 15:39:12 +0100
Subject: [MW:3771] hydrotest b31.1
From: daniel.iordache@gmail.com
To: materials-welding@googlegroups.com
Hi,
--
Daniel Iordache
Bureau Veritas - Angola
Mechanical& Welding Surveyor
Mobile Ao: +244921544583
Mobile Ro: +40721731728
E-Mail: daniel.iordache@gmail.com