Re: [MW:31020] 3 Cycle PWHT requirements acc.to ASME

Dear Kiran,
Once PWHT competed for joints due to modification cut/reweld or repair re PWHT required that particular joints.
it is mention in the procedure is enough to do the job. This you can mention in your weld repair procedure.
Regards,
PETER SOLOMAN
+971 33663119

On Mon, Jun 22, 2020 at 7:32 AM K K <karan.hbl@gmail.com> wrote:
Dear All,

Please describe to me regarding 3 cycle PWHT requirements as per ASME.

If my PQR tested with two coupons where I required one more test coupon and additional one more for repair.

Please explain to me in detail and related to mechanical testing for PWHT.

What is the meaning of this paragraph - **an additional one PWHT cycle shall be incorporated to simulate field repair or modification.**

Thanks and Regards
Kiran

--
https://materials-welding.blogspot.com/
https://www.linkedin.com/groups/122787
---
You received this message because you are subscribed to the Google Groups "Materials & Welding" group.
To unsubscribe from this group and stop receiving emails from it, send an email to materials-welding+unsubscribe@googlegroups.com.
To view this discussion on the web visit https://groups.google.com/d/msgid/materials-welding/2b255cdf-b673-4981-8fcf-ad1fb4863ecbo%40googlegroups.com.

--
https://materials-welding.blogspot.com/
https://www.linkedin.com/groups/122787
---
You received this message because you are subscribed to the Google Groups "Materials & Welding" group.
To unsubscribe from this group and stop receiving emails from it, send an email to materials-welding+unsubscribe@googlegroups.com.
To view this discussion on the web visit https://groups.google.com/d/msgid/materials-welding/CAMvP5szVLEP4-mGgj7GDvPn7t4HgWSkevibB7%2BRsws7XT9GXmg%40mail.gmail.com.

No comments:

Re: [MW:35241] Overlay welding defects

Dear Sir, The below is another type of defect,Mostly these two type of defects we faced. Regards, R.Gowtham. On Wed, Sep 11, 2024 at 1:42 PM...