dnt mix 31.3 with asme ..these all point belongs to asme only dnt apply to b31.3 check before use
On Mon, 29 Jun 2020, 6:51 pm K K, <karan.hbl@gmail.com> wrote:
Thanks all for your response to my query.--These requirements as per our contractor specification.But I need clarification about normal PWHT ( As per B31.3 ) and 3 cycles PWHT, for time calculation.Thanks once again.
On Monday, June 22, 2020 at 10:02:58 AM UTC+5:30, K K wrote:Dear All,Please describe to me regarding 3 cycle PWHT requirements as per ASME.If my PQR tested with two coupons where I required one more test coupon and additional one more for repair.Please explain to me in detail and related to mechanical testing for PWHT.What is the meaning of this paragraph - **an additional one PWHT cycle shall be incorporated to simulate field repair or modification.**Thanks and RegardsKiran
https://materials-welding.blogspot.com/
https://www.linkedin.com/groups/122787
---
You received this message because you are subscribed to the Google Groups "Materials & Welding" group.
To unsubscribe from this group and stop receiving emails from it, send an email to materials-welding+unsubscribe@googlegroups.com.
To view this discussion on the web visit https://groups.google.com/d/msgid/materials-welding/3d9bfe80-783d-4fa4-b161-4e80cde66952o%40googlegroups.com.
https://materials-welding.blogspot.com/
https://www.linkedin.com/groups/122787
---
You received this message because you are subscribed to the Google Groups "Materials & Welding" group.
To unsubscribe from this group and stop receiving emails from it, send an email to materials-welding+unsubscribe@googlegroups.com.
To view this discussion on the web visit https://groups.google.com/d/msgid/materials-welding/CAOWr6k9UOZjd2P7Dh9s%3D9oVJu3AoUL9dnG%3DOqGc%2B3R3i4cD_JQ%40mail.gmail.com.
No comments:
Post a Comment