Re: [MW:30691] Re: Time between root pass and hot pass

There is no requirement in ASME Sec.iX.

But API 1104 reference as below.

Inline image
Inline image


Thanks & Regards

J.Gerald Jayakumar



On Sunday, April 5, 2020, 01:57:09 PM GMT+7, Vinay Thattey <vinay.thattey@gmail.com> wrote:


Recut as explained by you is not required by code or specification . Inspection for surface defect is advised before subsequent pass.

Regards

On Mon, 10 Feb 2020 at 12:46, <tahirkaimi@gmail.com> wrote:
would you please guide me that can we left the joints after hot pass and complete the joints next day.

On Tuesday, 15 May 2012 18:25:43 UTC+5, jesti fer wrote:
Dear all,
We are doing 20" pipe line project with API 5L Gr.B material as per B31.4, Welding process SMAW (E6010 for root and rest with E 7018, both are up-hill) our welder welded one joint root pass and he kept this joint for long time. But our Qc instructed to cut and re-weld the joint. But the time between root pass and hot pass not mentioned in approved WPS and client specification also.
It necessary to cut and re-weld?
It is mentioned any were in the code (ASME or API)?
 
Please help me,,
  
Best Regards

--
https://materials-welding.blogspot.com/
https://www.linkedin.com/groups/122787
---
You received this message because you are subscribed to the Google Groups "Materials & Welding" group.
To unsubscribe from this group and stop receiving emails from it, send an email to materials-welding+unsubscribe@googlegroups.com.
To view this discussion on the web visit https://groups.google.com/d/msgid/materials-welding/7cecaded-0dcc-453f-acdc-fcf382f26300%40googlegroups.com.

--
https://materials-welding.blogspot.com/
https://www.linkedin.com/groups/122787
---
You received this message because you are subscribed to the Google Groups "Materials & Welding" group.
To unsubscribe from this group and stop receiving emails from it, send an email to materials-welding+unsubscribe@googlegroups.com.
To view this discussion on the web visit https://groups.google.com/d/msgid/materials-welding/CA%2BQ29OisDOCu6_QeSgt5HEhSFC6GYk1eJd902Yiamdz1hhzquA%40mail.gmail.com.

No comments:

Re: [MW:35289] Welding consumable for S355J2WP material

S355 J2 WP  is a weathering structural steel  It has better atmospheric corrosion resistance. Use E 8018 - W1/W2  Electrodes This is regular...