  Dear Experts,

We are fabricating leg cans as per B31.3, the material S690QL1 and thickness is 60 mm. After Oxy-Acetylene cutting the plate materials are  going for rolling for can preparation. Here my enquiry is if pre heating is required for high strength material before oxy-Acetylene cutting?  Is it mentioned in any code or anywhere? Please advise.

Regards 
Rajesh Kumar 
QA/QC Engineer 
Sent from myMail for iOS

No comments:

Re: [MW:35507] WPS for Furnace PWHT

As per ASME B31.3, Clause 331.1.6 (b): Any required PWHT shall be carried out in accordance with the qualified WPS. For furnace PWHT inv...