Dear group,

 

Please if you could analyzed the attached image.

 

It´s pipeline B31.8.

 

Constructor at first time, welded tube-flanged joint. Then realized that its necessary have an instrument as showed.

 

The ask is there´re some restrictions for minimal distance between weld joint and derivation in pipe.

 

Please if you could give some reference in design code.

 

Thanks in advance

 

Miroslav Tadic

Integrity Engineer

No comments:

[MW:34920] Tubesheet Hole step