Hi

Please refer Client specifications for welding or ASME Section IX latest edition 

Regards
P Govindan 

With Kind Regards

P Govindan 

On Fri, Sep 22, 2017 at 10:39 PM, me_ahmd <mehfil4all@gmail.com> wrote:
Dear friends,
Could anyone please guide me with codes and standards with respect to welding of SA 335 P91 pipes for high pressure and temperature boiler lines,

Looking forward for your contribution.

--
https://materials-welding.blogspot.com/
https://www.linkedin.com/groups/122787
---
You received this message because you are subscribed to the Google Groups "Materials & Welding" group.
To unsubscribe from this group and stop receiving emails from it, send an email to materials-welding+unsubscribe@googlegroups.com.
Visit this group at https://groups.google.com/group/materials-welding.
For more options, visit https://groups.google.com/d/optout.

--
https://materials-welding.blogspot.com/
https://www.linkedin.com/groups/122787
---
You received this message because you are subscribed to the Google Groups "Materials & Welding" group.
To unsubscribe from this group and stop receiving emails from it, send an email to materials-welding+unsubscribe@googlegroups.com.
Visit this group at https://groups.google.com/group/materials-welding.
For more options, visit https://groups.google.com/d/optout.

No comments:

[MW:35346] Cast-iron welding

Any advice for cast iron welding Sent from Yahoo Mail for iPhone