Dear All,
-- We have supply some fabrication parts to Australia,hence fillet weld is also need to qualify along with butt weld (As per Australian standard) for the procedure qualification.So I want to know that shall I merge both the joints in single WPS or else I have to make both separate.
Please suggest.
Regards,
Javed C
+91-8169668074
https://materials-welding.blogspot.com/
https://www.linkedin.com/groups/122787
---
You received this message because you are subscribed to the Google Groups "Materials & Welding" group.
To unsubscribe from this group and stop receiving emails from it, send an email to materials-welding+unsubscribe@googlegroups.com.
Visit this group at https://groups.google.com/group/materials-welding.
For more options, visit https://groups.google.com/d/optout.