Saturday, September 30, 2017

[MW:26843] WPS FOR FILLET WELD

Dear All, 

We have supply some fabrication parts to Australia,hence fillet weld is also need to qualify along with butt weld (As per Australian standard) for the procedure qualification.So I want to know that shall I merge both the joints in single WPS or else I have to make both separate.

Please suggest.

Regards,

Javed C

+91-8169668074

--
https://materials-welding.blogspot.com/
https://www.linkedin.com/groups/122787
---
You received this message because you are subscribed to the Google Groups "Materials & Welding" group.
To unsubscribe from this group and stop receiving emails from it, send an email to materials-welding+unsubscribe@googlegroups.com.
Visit this group at https://groups.google.com/group/materials-welding.
For more options, visit https://groups.google.com/d/optout.

No comments:

[MW:35614] Re: SS FILLER

dear , pl check A number and Gas composition use for ss cant be sutibale same % for duplex., u need to qualified with aditional testing of f...