I remember hydrotest for 42" condensate line going to offshore, the
complete line was pressurized for 24 hrs to see any leakage coming out
to soil top, but the line was also hydrotested spool basis before
backfill

Regards,
Srinivas

On 1/5/12, mohd.qce <mohd52100@gmail.com> wrote:
> Dear experts,
>
> Can any one give good and efficient method of underground(buried) pipe
> line leak testing method during hydrotest?
>
> Pipe: API 5L Gr 52 MS PSL-2.
> Length : Two section 50km+50km (2500 joints approx each section).
> Test pressure : 73.25 bar.
>
> --
> To post to this group, send email to materials-welding@googlegroups.com
> To unsubscribe from this group, send email to
> materials-welding+unsubscribe@googlegroups.com
> For more options, visit this group's bolg at
> http://materials-welding.blogspot.com/
> The views expressed/exchnaged in this group are members personel views and
> meant for educational purposes only, Users must take their own decisions
> w.r.t. applicable code/standard/contract documents.
>


--
Ohm Guru Namasivaya

--
To post to this group, send email to materials-welding@googlegroups.com
To unsubscribe from this group, send email to materials-welding+unsubscribe@googlegroups.com
For more options, visit this group's bolg at http://materials-welding.blogspot.com/
The views expressed/exchnaged in this group are members personel views and meant for educational purposes only, Users must take their own decisions w.r.t. applicable code/standard/contract documents.

No comments:

Re: [MW:35289] Welding consumable for S355J2WP material

S355 J2 WP  is a weathering structural steel  It has better atmospheric corrosion resistance. Use E 8018 - W1/W2  Electrodes This is regular...