no need to do DPT for rootrun BUT IF BACKGOUGING is consider then DPT required but 10% DPT should be done for final weld.
Regard, Narendra P. Makode, Production Engineer, Wheels India Ltd.
--- On Fri, 1/4/11, Bathula Raghuram (Mumbai - PIPING) <R.Bathula@ticb.com> wrote:
From: Bathula Raghuram (Mumbai - PIPING) <R.Bathula@ticb.com> Subject: RE: [MW:10574] DPT for Structural welding To: "'materials-welding@googlegroups.com'" <materials-welding@googlegroups.com> Date: Friday, 1 April, 2011, 5:11 PM
None by code, it shall be specified by the designer From: materials-welding@googlegroups.com [mailto:materials-welding@googlegroups.com] On Behalf Of Feroz Mohammed Sent: Friday, April 01, 2011 5:05 PM To: materials-welding@googlegroups.com Subject: [MW:10573] DPT for Structural welding Can any body tell me if it is required to do DPT for root run & after final welding in structural steel. If yes how much percentage Thanks & Regards Feroz Mohammed Deputy Manager-QA&I -- To post to this group, send email to materials-welding@googlegroups.com To unsubscribe from this group, send email to materials-welding+unsubscribe@googlegroups.com For more options, visit this group's bolg at http://materials-welding.blogspot.com/ The views expressed/exchnaged in this group are members personel views and meant for educational purposes only, Users must take their own decisions w.r.t. applicable code/standard/contract documents.
|
--
To post to this group, send email to materials-welding@googlegroups.com
To unsubscribe from this group, send email to materials-welding+unsubscribe@googlegroups.com
For more options, visit this group's bolg at
http://materials-welding.blogspot.com/ The views expressed/exchnaged in this group are members personel views and meant for educational purposes only, Users must take their own decisions w.r.t. applicable code/standard/contract documents.
No comments:
Post a Comment