Ali,

Post Weld heat treatment is governed by thickness of base pipe / Run
Pipe and as per table 331.1.1 of ASME B 31.3.

In most of the cases Run Pipe thickness is greater than or Equal to
Branch Pipe.


If you're run pipe falls under PWHT category than u have to do the
PWHT for that joint.

Hope Every body agrees with me.


Regards


On Feb 8, 6:29 pm, Ali Asghari <asghari...@rocketmail.com> wrote:
> Dear All
> According to ASME B31.3 fig328.5.4.D( SKETCH1) the thickness of weld deposit is
> calculated acc to 331.1.3.
> Now in weldolet fittings that have unequal thicknesses in both of ends. Tb is
> equal to thicker or thinner thickness?why?
> we need to know for calculating of governing thickness for PWHT.
> regards.

--
To post to this group, send email to materials-welding@googlegroups.com
To unsubscribe from this group, send email to materials-welding+unsubscribe@googlegroups.com
For more options, visit this group's bolg at http://materials-welding.blogspot.com/
The views expressed/exchnaged in this group are members personel views and meant for educational purposes only, Users must take their own decisions w.r.t. applicable code/standard/contract documents.

No comments:

[MW:34916] Applicability of Impact requirement as per ASME B31.3

Dear All, Design code – ASME B31.3, Welding Code- ASME BPVC SEC IX Material  to be used used during Fabrication - SA 333Gr6 (P No.1 G...