Dear experts,

We are executing a project for 35 TPH Natural Gas fired Auxiliary Boiler designed for max. working pressure of 60 kg/cm2 and steam temperature of 392 Deg .Cel.

All water tubes of boiler are connected to steam( 63 mm Thk) & Mud drum(40mm Thk) with expanded design of construction.

In mud drum it is observed that tubes ( 51X4 mm) are expanded upto 30mm more than the drum thickness and indicating as bulged. we have checked the OD at bulged part and observed 1-2 mm flared and thickness around 3.5 mm

Kindly advise weather it is acceptable or we have to replace the se tubes with reference to code. Code of construction is ASME Sec-1/IBR.

--
https://materials-welding.blogspot.com/
https://www.linkedin.com/groups/122787
---
You received this message because you are subscribed to the Google Groups "Materials & Welding" group.
To unsubscribe from this group and stop receiving emails from it, send an email to materials-welding+unsubscribe@googlegroups.com.
To view this discussion on the web visit https://groups.google.com/d/msgid/materials-welding/bbc02a3f-f869-4c58-a898-ed522ce25df6n%40googlegroups.com.

No comments:

Re: [MW:35289] Welding consumable for S355J2WP material

S355 J2 WP  is a weathering structural steel  It has better atmospheric corrosion resistance. Use E 8018 - W1/W2  Electrodes This is regular...