Thursday, December 17, 2020

[MW:31857] PWHT required after Preheat for CS or LTCS

Dear Experts,

Hope you all are well.

I have a question is about the weld of the base material of CS (or Low temp. CS) with wall thickness greater than 25mm, Do we still required PWHT if we applied a preheating process before, or PWHT is no longer mandatory?

And which reference can be found?

Thank you & best regards./.

--
https://materials-welding.blogspot.com/
https://www.linkedin.com/groups/122787
---
You received this message because you are subscribed to the Google Groups "Materials & Welding" group.
To unsubscribe from this group and stop receiving emails from it, send an email to materials-welding+unsubscribe@googlegroups.com.
To view this discussion on the web visit https://groups.google.com/d/msgid/materials-welding/CAKr%2BxwbEWDaz5Lo9eQpu_iY7m4Gewk3V9A%3D556vTj9QwUkBHQQ%40mail.gmail.com.

No comments:

Re: [MW:35289] Welding consumable for S355J2WP material

S355 J2 WP  is a weathering structural steel  It has better atmospheric corrosion resistance. Use E 8018 - W1/W2  Electrodes This is regular...