Friday, July 31, 2020

[MW:31241] Welder qualified in API1104 Standard with destructive testing re destructive test require for station piping.(sec-ix)

Respected all experts,

I have one welder who qualified in API standard (for line pipe,gas field)with DT reports but now we want to do his new qualification for station piping as per Section ix Standard,for his qualification destructive test again require or not.
Or radiography base we can qualify to him.

From
Herish varude
Mob.No.:-7990746918

--
https://materials-welding.blogspot.com/
https://www.linkedin.com/groups/122787
---
You received this message because you are subscribed to the Google Groups "Materials & Welding" group.
To unsubscribe from this group and stop receiving emails from it, send an email to materials-welding+unsubscribe@googlegroups.com.
To view this discussion on the web visit https://groups.google.com/d/msgid/materials-welding/CAGP-YKLrY6EtcSGS%2Bqi_fBfMDSemr7awiFkDuACDb4EUoCSNfQ%40mail.gmail.com.

No comments:

Re: [MW:35289] Welding consumable for S355J2WP material

S355 J2 WP  is a weathering structural steel  It has better atmospheric corrosion resistance. Use E 8018 - W1/W2  Electrodes This is regular...