Monday, December 2, 2019

Re: [MW:30247] Time lag between Hydro test Dewatering completion and swabbing completion

Pradip,

As per ADNOC specification De watering should be completed within one week. please see below snapshot extracted from DGS 9550-002 rev 1.



regards 

NOUFAL MC

On Mon, Dec 2, 2019 at 1:24 PM pradip kumar Sil <pradipsil@gmail.com> wrote:
Dear All,
Can anybody inform me How much  time lag between Hydro test Dewatering completion and swabbing completion in the pipeline with code reference.
Regards
Pradip

--
https://materials-welding.blogspot.com/
https://www.linkedin.com/groups/122787
---
You received this message because you are subscribed to the Google Groups "Materials & Welding" group.
To unsubscribe from this group and stop receiving emails from it, send an email to materials-welding+unsubscribe@googlegroups.com.
To view this discussion on the web visit https://groups.google.com/d/msgid/materials-welding/CAB%3DAs8%3DdXk%2BFh7JXe-062dsyd6c0_2%2BSGaSusbbgGPyBPFymcA%40mail.gmail.com.

--
https://materials-welding.blogspot.com/
https://www.linkedin.com/groups/122787
---
You received this message because you are subscribed to the Google Groups "Materials & Welding" group.
To unsubscribe from this group and stop receiving emails from it, send an email to materials-welding+unsubscribe@googlegroups.com.
To view this discussion on the web visit https://groups.google.com/d/msgid/materials-welding/CA%2BnmLwURejWiv_pATP%2B__FFjDjgyM%3DEbow69X%2B4_eG50dHzL0w%40mail.gmail.com.

No comments:

Re: [MW:35289] Welding consumable for S355J2WP material

S355 J2 WP  is a weathering structural steel  It has better atmospheric corrosion resistance. Use E 8018 - W1/W2  Electrodes This is regular...