Friday, June 23, 2017

Re: [MW:26637] Re: NDT Requirement

dear,

Pls. check the your approved NDT plan for structure as well as Piping.

And carried out required Ndt for Piping support.

regards,

Rajendra Jadhav

On Fri, Jun 23, 2017 at 12:19 PM, 'Mac Palola' via Materials & Welding <materials-welding@googlegroups.com> wrote:
If the Construction Code is B31.1 then refer to Table 136.4


--
https://materials-welding.blogspot.com/
https://www.linkedin.com/groups/122787
---
You received this message because you are subscribed to the Google Groups "Materials & Welding" group.
To unsubscribe from this group and stop receiving emails from it, send an email to materials-welding+unsubscribe@googlegroups.com.
Visit this group at https://groups.google.com/group/materials-welding.
For more options, visit https://groups.google.com/d/optout.

--
https://materials-welding.blogspot.com/
https://www.linkedin.com/groups/122787
---
You received this message because you are subscribed to the Google Groups "Materials & Welding" group.
To unsubscribe from this group and stop receiving emails from it, send an email to materials-welding+unsubscribe@googlegroups.com.
Visit this group at https://groups.google.com/group/materials-welding.
For more options, visit https://groups.google.com/d/optout.

No comments:

[MW:35346] Cast-iron welding

Any advice for cast iron welding Sent from Yahoo Mail for iPhone