API Manual of Petroleum Measurement Standards Chapter 2, Section 2A will give you guidelines, and most of the calibration agencies will you provide you with the required method statements.
-- On 14 June 2017 at 04:45, Bagus Yusrianto,S. ST. <byusrianto13@gmail.com> wrote:
Hi Mr,
I have same problem with you, did you have an answer for your question above sir?
Thank You,
Best Regards,
Bagus Yusrianto,S.ST,
Pada Sabtu, 19 Juni 2010 13.12.13 UTC+7, BHARAT GOLE menulis:Hi All,
We have constructed Oil & Fire water tank as per API 650The Project Specification calls for tank a calibration to be made in line with the requirements of API Manual of Petroleum Measurement standard (MPMS).
As stipulated, Contractor shall submit the Procedure describing the system proposed and methodology to Company for review and Approval prior to proceed.
I have not come across with this kind of requirement.
Please share your views if someone knows about this requirement
Thanks in advance
RegardsBharat B. Gole
https://materials-welding.blogspot.com/
https://www.linkedin.com/groups/122787
---
You received this message because you are subscribed to the Google Groups "Materials & Welding" group.
To unsubscribe from this group and stop receiving emails from it, send an email to materials-welding+unsubscribe@googlegroups.com.
Visit this group at https://groups.google.com/group/materials-welding.
For more options, visit https://groups.google.com/d/optout.
No comments:
Post a Comment