Please refer the material requisition and data sheet of the project about NDE requirement.
Or let me know the material specification of the tube.
Regards
GOVIN
On Jun 6, 2017 15:29, "Zakaria ghrab" <zakaria.ghrab@gmail.com> wrote:
-- Dear all,--Could you please advice:- Project : Power plant construction project- Construction code ASME B31.1Query : Oil piping (tubing) for mechnaical equipments (Fans,...) :- Any ASME or API related code/standard ?- code for construction, welding and NDE ?- Pressure test : is it mandatory ? Pneumatic or just oil flushingThank you for your support.--Thanks and Regards,-----زكرياء غراب
GHRAB ZakariaTunisia : +216 96 635 805Yesterday is the past, tomorrow is the future; and today? Today is the present, the gift: Enjoy it!
https://materials-welding.blogspot.com/
https://www.linkedin.com/groups/122787
---
You received this message because you are subscribed to the Google Groups "Materials & Welding" group.
To unsubscribe from this group and stop receiving emails from it, send an email to materials-welding+unsubscribe@googlegroups.com .
Visit this group at https://groups.google.com/group/materials-welding .
For more options, visit https://groups.google.com/d/optout .
https://materials-welding.blogspot.com/
https://www.linkedin.com/groups/122787
---
You received this message because you are subscribed to the Google Groups "Materials & Welding" group.
To unsubscribe from this group and stop receiving emails from it, send an email to materials-welding+unsubscribe@googlegroups.com.
Visit this group at https://groups.google.com/group/materials-welding.
For more options, visit https://groups.google.com/d/optout.
No comments:
Post a Comment