Dear Gents,
Oil line can do hydrotest . Since it is non boiler external piping-follow ASME 31.3 Code.
On Jun 6, 2017 6:59 PM, "Zakaria ghrab" <zakaria.ghrab@gmail.com> wrote:
Dear all,--Could you please advice:- Project : Power plant construction project- Construction code ASME B31.1Query : Oil piping (tubing) for mechnaical equipments (Fans,...) :- Any ASME or API related code/standard ?- code for construction, welding and NDE ?- Pressure test : is it mandatory ? Pneumatic or just oil flushingThank you for your support.--Thanks and Regards,-----زكرياء غراب
GHRAB ZakariaTunisia : +216 96 635 805Yesterday is the past, tomorrow is the future; and today? Today is the present, the gift: Enjoy it!
https://materials-welding.blogspot.com/
https://www.linkedin.com/groups/122787
---
You received this message because you are subscribed to the Google Groups "Materials & Welding" group.
To unsubscribe from this group and stop receiving emails from it, send an email to materials-welding+unsubscribe@googlegroups.com .
Visit this group at https://groups.google.com/group/materials-welding .
For more options, visit https://groups.google.com/d/optout .
https://materials-welding.blogspot.com/
https://www.linkedin.com/groups/122787
---
You received this message because you are subscribed to the Google Groups "Materials & Welding" group.
To unsubscribe from this group and stop receiving emails from it, send an email to materials-welding+unsubscribe@googlegroups.com.
Visit this group at https://groups.google.com/group/materials-welding.
For more options, visit https://groups.google.com/d/optout.
No comments:
Post a Comment