Hi friends,
I need some welding techniques for the below issue.
we have pipe spools of 1"& 3/4" with pipe to valves.
Can any body suggest me, how to prepare for welding with pipe to valve.
All joints are socket welds.
1. whether I have to keep the valve in open or closed condition?
2. whether I have to remove the gland from the valves during welding?
Kindly suggest me, if there is any procedure for this process?
Thanks and regards,
M. Sivachidambaram
QHSE Engineer
You received this message because you are subscribed to the Google Groups "Materials & Welding" group.
To unsubscribe from this group and stop receiving emails from it, send an email to materials-welding+unsubscribe@googlegroups.com.
To post to this group, send email to materials-welding@googlegroups.com.
Visit this group at http://groups.google.com/group/materials-welding.
To view this discussion on the web visit https://groups.google.com/d/msgid/materials-welding/CAPJQpMXin8C_OX%3DVkx4%2Br5MSaCJfo68N3NUysxxam7mhAUpe%3Dg%40mail.gmail.com.
For more options, visit https://groups.google.com/d/optout.
No comments:
Post a Comment