Dear Team,
I like to get clarification for good understanding about holiday test requirements.
Due to inside corrosion / biting in crude oil live line, the live line was strengthen by installed outer sleeve on the pipeline. After that the cap between the sleeve and pipe it was filled with Epoxy materials. Now the pipe are wrapped with cold wrapping material (1.65mm thickness) becasue the same line will back filling by sand.
It is required to do holiday test. Now my question, the line is in service with 5 MB pressure. Is it acceptable for do the holiday test by using 10KV current on live line and the line will be earthed.
I am seeking the advice from Coating Expats. Please
Best Regards
To post to this group, send email to materials-welding@googlegroups.com
To unsubscribe from this group, send email to materials-welding+unsubscribe@googlegroups.com
For more options, visit this group's bolg at http://materials-welding.blogspot.com/
http://www.linkedin.com/groups/MaterialsWelding-122787?home=&gid=122787&trk=anet_ug_hm
The views expressed/exchnaged in this group are members personel views and meant for educational purposes only, Users must take their own decisions w.r.t. applicable code/standard/contract documents.
---
You received this message because you are subscribed to the Google Groups "Materials & Welding" group.
To unsubscribe from this group and stop receiving emails from it, send an email to materials-welding+unsubscribe@googlegroups.com.
For more options, visit https://groups.google.com/d/optout.
Comments