I think you should verify the requirements in specification too

Sent from Yahoo Mail on Android



From: guru vasanth <guruvasanth@gmail.com>;
To: <materials-welding@googlegroups.com>;
Subject: Re: [MW:20453] Weld joint Repair
Sent: Tue, Apr 1, 2014 4:19:00 AM

How many times can a weld be re-welded?

Frequently Asked Questions

However, much will depend on the type of material being welded and the process in use. If the material is known to be metallurgically 'sensitive' to heat input, which could result in degradation of both the HAZ and weld deposit, it then becomes a question of complete removal of the welded joint and replacement with an inserted section.

Materials such as mild, low carbon and carbon-manganese steels, are considered to be very tolerant to heat input and may accept at least two or more re-weld operations. In the case of low alloy steels, re-welds will be governed by the heat-treated condition in which they were supplied. For the Cr-Mo steels, up to two re-welds may be carried out, but consideration needs to be given to the post-weld heat treatment operations and possible resultant degradation of the welded joint.

With the 3xx series stainless steels, two re-welds may be tolerated, but in the case of the duplex and super duplex stainless steels, only one re-weld operation is advisable, and then with extreme care and control over the heat input. Ideally, for these complex metallurgical materials, avoidance of any form of re-weld operation is favoured.

The aluminium alloys (5xxx) series can generally be regarded as a two re-weld operation but the (6xxx) series is far more sensitive to heat input and even a single re-weld operation is undesirable.

Of course when considering re-weld operations for what ever reason, consideration must be given to the following: material thickness, distortion problems, build up of residual stresses, and not forgetting the weldability rating of the material.


Thanks and regards


Guru



On 31 March 2014 21:42, Saidur Rahman <saidur04cuet@gmail.com> wrote:
Dear Experts,

I am working on 30" High pressure gas transmission pipeline project. Today i found that in one RT film there was 100 mm Internal undercut. After repair RT film shows that again 45 mm internal undercut with Internal Concavity. But my superior says that only one time repair is acceptable & joint should go for cut-out  because if again repair then Susceptible micro structure will form. my question is How many times repair is acceptable? Pipe material API 5L-X 60. thickness= 14.3 mm
and also for Process piping how many times repair is acceptable if PWHT is a service requirement?

Regards,

Md. Saidur Rahman
QA/QC
GTCL

--
To post to this group, send email to materials-welding@googlegroups.com
To unsubscribe from this group, send email to materials-welding+unsubscribe@googlegroups.com
For more options, visit this group's bolg at http://materials-welding.blogspot.com/
http://www.linkedin.com/groups/MaterialsWelding-122787?home=&gid=122787&trk=anet_ug_hm
 
The views expressed/exchnaged in this group are members personel views and meant for educational purposes only, Users must take their own decisions w.r.t. applicable code/standard/contract documents.
---
You received this message because you are subscribed to the Google Groups "Materials & Welding" group.
To unsubscribe from this group and stop receiving emails from it, send an email to materials-welding+unsubscribe@googlegroups.com.
For more options, visit https://groups.google.com/d/optout.

--
To post to this group, send email to materials-welding@googlegroups.com
To unsubscribe from this group, send email to materials-welding+unsubscribe@googlegroups.com
For more options, visit this group's bolg at http://materials-welding.blogspot.com/
http://www.linkedin.com/groups/MaterialsWelding-122787?home=&gid=122787&trk=anet_ug_hm
 
The views expressed/exchnaged in this group are members personel views and meant for educational purposes only, Users must take their own decisions w.r.t. applicable code/standard/contract documents.
---
You received this message because you are subscribed to the Google Groups "Materials & Welding" group.
To unsubscribe from this group and stop receiving emails from it, send an email to materials-welding+unsubscribe@googlegroups.com.
For more options, visit https://groups.google.com/d/optout.

--
To post to this group, send email to materials-welding@googlegroups.com
To unsubscribe from this group, send email to materials-welding+unsubscribe@googlegroups.com
For more options, visit this group's bolg at http://materials-welding.blogspot.com/
http://www.linkedin.com/groups/MaterialsWelding-122787?home=&gid=122787&trk=anet_ug_hm
 
The views expressed/exchnaged in this group are members personel views and meant for educational purposes only, Users must take their own decisions w.r.t. applicable code/standard/contract documents.
---
You received this message because you are subscribed to the Google Groups "Materials & Welding" group.
To unsubscribe from this group and stop receiving emails from it, send an email to materials-welding+unsubscribe@googlegroups.com.
For more options, visit https://groups.google.com/d/optout.

No comments:

[MW:35346] Cast-iron welding

Any advice for cast iron welding Sent from Yahoo Mail for iPhone