​Agreed, But i believe,the inspector must have been sensible enough to understand that if constant pressure is not maintained, then no point in accepting the valve.Otherwise, despite giving proper test, if still the apparatus valve is leaking, it ought not to be a major issue. 


From: materials-welding@googlegroups.com <materials-welding@googlegroups.com> on behalf of M.Sathiya Narayanan <gmvsathya@gmail.com>
Sent: 08 January 2019 21:57
To: materials-welding@googlegroups.com
Subject: [SOCIAL NETWORK] Re: [MW:28872]
 
if no pressure drop in test duration it is acceptable


On Tue, 8 Jan 2019 at 09:45, Nishanth Km <nishanthkm21@gmail.com> wrote:
Dear experts,

Please advise

Hydro test conducted under Asme 31.3, after test duration time it was found the bleed valve in the the manifold found leaking.

Can we accept the test or reject? Please mention how also?

Regards


--
https://materials-welding.blogspot.com/
https://www.linkedin.com/groups/122787
---
You received this message because you are subscribed to the Google Groups "Materials & Welding" group.
To unsubscribe from this group and stop receiving emails from it, send an email to materials-welding+unsubscribe@googlegroups.com.
Visit this group at https://groups.google.com/group/materials-welding.
For more options, visit https://groups.google.com/d/optout.


--
Thanks and Regards
M.Sathyanarayanan

--
https://materials-welding.blogspot.com/
https://www.linkedin.com/groups/122787
---
You received this message because you are subscribed to the Google Groups "Materials & Welding" group.
To unsubscribe from this group and stop receiving emails from it, send an email to materials-welding+unsubscribe@googlegroups.com.
Visit this group at https://groups.google.com/group/materials-welding.
For more options, visit https://groups.google.com/d/optout.


----------------------------------------------------------------------------------------------------------
Information transmitted by this E-MAIL is intended only for the use of the addressee(s) and contains information that is privileged, confidential or exempt from disclosure under applicable law. If you are not the intended recipient or it appears that this mail has been forwarded to you without proper authority, you are notified that any use or dissemination and or copying of this email in any manner is strictly prohibited and you are requested to delete this e-mail immediately.
Communicating through e-mail is not secure and capable of interception and delays. Any one communicating with TATA Consulting Engineers Ltd., and / or its subsidiaries or associates or group companies by e-mail accepts the risks involved and their consequences.
While this e-mail has been checked for all known viruses, the addressee should also scan for viruses and notify the originator of e-mail.
---------------------------------------------------------------------------------------------------------

No comments:

Re: [MW:35289] Welding consumable for S355J2WP material

S355 J2 WP  is a weathering structural steel  It has better atmospheric corrosion resistance. Use E 8018 - W1/W2  Electrodes This is regular...