As per API-1104 it is essential,

1) if you have both WPS,you can just change your reports.
2) if it is welded with internal clamp instead of external,then it is more stringent..and it is acceptable.
3) if is welded with external clamp instead of internal clamp,then it is not acceptable.
    # support to cut out
    # extra NDT (RT+UT) can be suggested.

On Saturday, November 17, 2018 at 5:32:26 AM UTC+3, Ri@z wrote:
Dear  All,


External clamp and internal clamp WPS and PQR procedures are qualified with downhill process and uphill process respectively.  But one joint has welded with internal clamp following  all other variables as of external clamp WPS


Is this acceptable ? If yes , how can we justify ?

Pls help very urgent 


Ray


--
https://materials-welding.blogspot.com/
https://www.linkedin.com/groups/122787
---
You received this message because you are subscribed to the Google Groups "Materials & Welding" group.
To unsubscribe from this group and stop receiving emails from it, send an email to materials-welding+unsubscribe@googlegroups.com.
Visit this group at https://groups.google.com/group/materials-welding.
For more options, visit https://groups.google.com/d/optout.

No comments:

Re: [MW:35289] Welding consumable for S355J2WP material

S355 J2 WP  is a weathering structural steel  It has better atmospheric corrosion resistance. Use E 8018 - W1/W2  Electrodes This is regular...