Hi,
According to UW40 (f) 5).. you are correct. (When a weld joint connects the parts of un equal thicknesses, nominal thickness shall be the the thinner of the adjacent butt weld parts. In your case if the shell thickness in the thinner one then you can use this thickness as a nominal thickness for PWHT calculations.
Thanks & Regards,

(Karthik)

Karthikeyan.S
QA/QC Manager
German-Thai Boiler Engineering Cooperation Limited.
Rayong Factory ;
379 Moo.6 Soi 8, Tambol Pananikom,
Nikompattana, Rayong 21180 THAILAND
Tel : +66 38 897 035-9 Ext. 137
Fax : +66 38 897 034
Hand Phone: 0066 892512282


On Saturday, August 30, 2014 2:25 PM, hask engineering <haskengineering@gmail.com> wrote:


Dear Sir,
 
Please clarify that as per ASME section VIII division 1, what thickness    must be taken for PWHT soaking time calculation. As per UW-40 f(5)- in head to shell joint, lesser thikness must be considered. But in our job,(P1 material ) our client inspector is saying to take the nominal thickness of head. Please give your suggestion.
 
Regards,
 
Kashif
 
 

On Saturday, March 3, 2012 12:34:39 PM UTC+3, Vino wrote:
Dear Sirs,
 
I AM ALWAYS GETTING A POST DELIVERY FAILURE NOTE STATING THAT THE MESSAGE IS NOT DELIVERED. CAN ANYONE HELP ME OUT OF THIS.....
 
This is the very reason I am writing direct mail, sincere apology for same. Query below -
 
The PWHT Temp range is different in ASME B31.3(Table 331.1.1) and ASME Sec VIII Div 1(Table UCS 56), but both are from ASME. The welding and welder qualification are as per ASME Sec IX, for both B31.3 and Sec VIII, Div 1.
 
Why ASME Committee put such a different requirement although both are published from ASME and material grouping is also the same, means the metallurgical properties should be same, i assume.
What should be the criteria of PWHT for PQR run on a Pressure Vessel? If I have qualified a PQR using ASME B31.3 taking account of B 31.3 PWHT Criteria, is it acceptable to have the same PQR on Pressure Vessel (Designed as per ASME Sec VIII, Div 1).
 
Looking forward for a technical clarification.
 
Thanks & Regards
Vino-Doha
 


Comments

Popular posts from this blog

Materails FAQs

Q: What are equivalents for standard Q 235 B (and Q 235 A) for U-channels? (asked by: boris.vielhaber@vait.com) A: DIN Nr. = 2393 T.2, 2394 T.2, EN 10025 W. Nr. DIN 17007 = 1.0038 Design DIN 17006 = RSt 37-2, S235JRG2 (Fe 360 B) Q: What is St DIN 2391 BK material? (asked by: dmcandrews@automaticstamp.com) A: Precision steel tubes, cold-finished/hard. Q: What is C.D.W. Boiler Tube? (asked by: montydude123@yahoo.com) A: Cold Drawn Welded Boiler Tube. Q: WHAT IS W.Nr. 1.4301? PLS TELL US IN EASY LANGUAGUE (asked...

Heat tint (temper) colours on stainless steel surfaces heated in air // Heat tint

Introduction The colour formed when stainless steel is heated, either in a furnace application or in the heat affected zone of welds, is dependent on several factors that are related to the oxidation resistance of the steel. The heat tint or temper colour formed is caused by the progressive thickening of the surface oxide layer and so, as temperature is increased, the colours change.   Oxidation resistance of stainless steels However, there are several factors that affect the degree of colour change and so there is no a single table of colour and temperature that represents all cases. The colours formed can only be used as an indication of the temperature to which the steel has been heated. Factors affecting the heat tint colours formed Steel composition The chromium content is the most important single factor affecting oxidation resistance. The higher the chromium, the more heat resistant the steel and so the development of the heat tint colou...

Re: [MW:10788] ON PLOT PIPING & OFF PLOT PIPING

Piping systems involved for the flow lines and gathering lines from the well head isolation valve to the production facility or processing plant isolation valve are determined as OFF PLOT. ON PLOT defines piping system in the processing plant and production platform. ANSI/ASME B31.4 applies for off plot piping system. B31.4 allows the use of either API 1104 or ASME section IX (as appropriate). However, occasionally, a very small system such as piping within 500 feet of a processing plant (some client also said 400 feet) may be declared B31.3 rather than B31.4. When B31.3 is invoked, only ASME Section IX is used. before you decide which code to use for welding procedure and/or welder qualification for pipe welding, you have to know the design and construction code applicable to the system. Please read far enough into scope and diagram illustrating the application of either B31.3 and B31.4 hope this helps rgds 2011/4/21 pradip kumar sil < pradipsil@gmail.com > Dear all, ...