We have carried out CCTV inspection on new O2 piping (about 20m long of accessible opened flanged vertical and horizontal 6-in piping) installed during Revamp and visually found paintwork marks adjacent to weld joints, welding flux, stain mark which was a left-over mark by a CS metal plate laid inside the piping (inside the horizontal piping) and particulates. As per specifications the O2 piping shall be free from all contaminants which may react easily such as petroleum products (paintwork marks, oil, grease and organic materials) and shall be free from the presence of particulate matter which may react with O21 and/or eventually ignite the piping.
Seek your technical advice on the findings and greatly appreciate to share on recommendations.
--
To post to this group, send email to materials-welding@googlegroups.com
To unsubscribe from this group, send email to materials-welding-unsubscribe@googlegroups.com
For more options, visit this group's bolg at http://materials-welding.blogspot.com/
The views expressed/exchnaged in this group are members personel views and meant for educational purposes only, Users must take their own decisions w.r.t. applicable code/standard/contract documents.
No comments:
Post a Comment