     Defenetely if it is a crude/ jet fuel tank you have to Paint the bottom plates as well as roof internal structures. I had done the job,  for coating Bottom plate fiberglas lining, glass flake linning, upto 1 mtr from bottom & for the top up to 2 mtrs.
 
Regards,
Y.C.Shiva,
QA/QC Mechanical Engineer
CSWIP3.1, NACE CIP 2, API 653,
Doha Qatar,

On Wed, Aug 5, 2009 at 9:40 AM, BHARAT GOLE <bharatgole@hotmail.com> wrote:
Regarding internal painting of oil tank , fixed roof,Code API 650, Design temp. -10/+59 our company specification says "Extend 2 m down from the roof and 1 m up from the bottom."

Now I am not able to conclude whether this includes painting  on bottom plates as well as roof( internal)
regards

Bharat B. Gole

 





Date India's Teen Diva. Find out if you hit it off with her or are her fiery opposite. Drag n' drop --~--~---------~--~----~------------~-------~--~----~
To post to this group, send email to materials-welding@googlegroups.com
To unsubscribe from this group, send email to materials-welding-unsubscribe@googlegroups.com
For more options, visit this group's bolg at http://materials-welding.blogspot.com/
The views expressed/exchnaged in this group are members personel views and meant for educational purposes only, Users must take their own decisions w.r.t. applicable code/standard/contract documents.
-~----------~----~----~----~------~----~------~--~---

No comments:

Re: [MW:35289] Welding consumable for S355J2WP material

S355 J2 WP  is a weathering structural steel  It has better atmospheric corrosion resistance. Use E 8018 - W1/W2  Electrodes This is regular...