Friends,

Helium leak test may be carried out to ensure the quality of TTS weld joints after PT.

Rajesh


--- On Mon, 10/6/08, Tirumala B N Tagore <tagore.tbn@gmail.com> wrote:

> From: Tirumala B N Tagore <tagore.tbn@gmail.com>
> Subject: [MW:1187] Re: 1177] Radiography of tube to tubesheet welds
> To: materials-welding@googlegroups.com
> Date: Monday, October 6, 2008, 1:52 PM
> In ceratin conditions Tube are attached to tube sheet by
> Butt weld
> configuration. (Eg when coke formation is anticipated,
> thermal gradient
> requirements demand etc.)
> In such cases TTP joint is examined by UT. The butt weld
> is a
> radiographable theoretically but in practice RT is not
> feasible due to
> presence of cluster of joints. UT is the NDE demaded for
> such joints.
> Internal bore welding machines are used for such welds.
> Tagore
>
>
> On 10/5/08, Jignesh Patel <nacemail@gmail.com> wrote:
> >
> >
> > Dear Mr. Raghuram,
> >
> > I have never heard or seen RT of TTS [Tube to
> Tubesheet joints]. TTS welds
> > are normally checked by Penetrant testing, Pneumatic
> testing and complete
> > penetration [during mock up tests].
> >
> > I too would like to know if RT of TTS is carried out
> and how its done.
> >
> > Thanks and regards,
> >
> >
> >
> > Jignesh
> >
> > Kuwait
> >
> >
> >
> > For your virus protection, any attachments should be
> considered
> > uncontrolled
> > unless they are identified in the text. The sender
> does not accept
> > liability
> > for any virus introduced by this email or any
> attachment.
> >
> > -----Original Message-----
> > From: materials-welding@googlegroups.com
> > [mailto:materials-welding@googlegroups.com] On Behalf
> Of Bathula Raghuram
> > (Mumbai - PIPING)
> > Sent: Wednesday, October 01, 2008 11:18 AM
> > To: Materials-Welding (E-mail)
> > Subject: [MW:1177] Radiography of tube to tubesheet
> welds
> >
> >
> > Can anybody has experience with performance of RT on
> tube to tubesheet
> > welds, please share details for both techniques (i.e.
> back radiation and
> > forward radiation), equipment literature if any for
> this type RT.
> >
> >
> >
> >
> > >
> >
>
>

--~--~---------~--~----~------------~-------~--~----~
To post to this group, send email to materials-welding@googlegroups.com
To unsubscribe from this group, send email to materials-welding-unsubscribe@googlegroups.com
For more options, visit this group's bolg at http://materials-welding.blogspot.com/
The views expressed/exchnaged in this group are members personel views and meant for educational purposes only, Users must take their own decisions w.r.t. applicable code/standard/contract documents.
-~----------~----~----~----~------~----~------~--~---

Comments

Popular posts from this blog

Materails FAQs

Q: What are equivalents for standard Q 235 B (and Q 235 A) for U-channels? (asked by: boris.vielhaber@vait.com) A: DIN Nr. = 2393 T.2, 2394 T.2, EN 10025 W. Nr. DIN 17007 = 1.0038 Design DIN 17006 = RSt 37-2, S235JRG2 (Fe 360 B) Q: What is St DIN 2391 BK material? (asked by: dmcandrews@automaticstamp.com) A: Precision steel tubes, cold-finished/hard. Q: What is C.D.W. Boiler Tube? (asked by: montydude123@yahoo.com) A: Cold Drawn Welded Boiler Tube. Q: WHAT IS W.Nr. 1.4301? PLS TELL US IN EASY LANGUAGUE (asked...

[MW:30043] Weep hole

If weep hole is not provided in dummy pipe before welding What will happen??? -- https://materials-welding.blogspot.com/ https://www.linkedin.com/groups/122787 --- You received this message because you are subscribed to the Google Groups "Materials & Welding" group. To unsubscribe from this group and stop receiving emails from it, send an email to materials-welding+unsubscribe@googlegroups.com . To view this discussion on the web visit https://groups.google.com/d/msgid/materials-welding/da251ee6-fa7f-4851-b876-cdb3834ae341%40googlegroups.com .

[MW:36169] Cold Bending Qualification

Dear Experts,  Can anyone share the inspection requirements or a qualification procedure for cold bending? Our client spec states only the requirements for induction bending and would like to know your opinion on the cold bend inspection requirements. The code of construction is B31.3, Max. 5D bends, A106 SS 316L.  Thanks in Advance. -- https://materials-welding.blogspot.com/ https://www.linkedin.com/groups/122787 --- You received this message because you are subscribed to the Google Groups "Materials & Welding" group. To unsubscribe from this group and stop receiving emails from it, send an email to materials-welding+unsubscribe@googlegroups.com . To view this discussion visit https://groups.google.com/d/msgid/materials-welding/1be61cc3-e9c9-4a5f-834d-e8485e248432n%40googlegroups.com .