You have to qualify new PQR as group number is essential (in case of impact testing applications) in your project.I hope consumables are different for P1G3 than P1 G1 as base material strength is on the higher side. if strengths are different check tensile values in PQR both the PQR'S then decide whether these PQR can be combined or not even for non- impact applications.
 
Regards,
Srinivas Rao

On Tue, May 2, 2023 at 7:58 AM Vishwas Keskar <vvkeskar123@gmail.com> wrote:
Is impact testing is required in production welds?
If not , then Group number is NOT A ESSENTIAL VARIABLE .

Prepare WPS based on available qualified  PQR and use in production welding after review of Weld Plan/Weld Map from AI/TPI as required 

Thanks 
Vishwas 
IWE


On Tue, May 2, 2023 at 8:17 AM U B <dusroni@gmail.com> wrote:

Dear Professionals,

Please describe & explain to me the combination of welding procedures.
As per my project specification group number is essential. I has been separate PQR's P1G1-P1G1 & P1G3-P1G3, now I have to do combination welding P1G1-P1G3. Should I create a new PQR in this case? Or can I combine this PQR P1G1-P1G1 & P1G3-P1G3 (as per QW-200.4 combination of welding procedures)?
Please advise me.
--
With Regards

Udaya bahaskar.D

+919676270121

--
https://materials-welding.blogspot.com/
https://www.linkedin.com/groups/122787
---
You received this message because you are subscribed to the Google Groups "Materials & Welding" group.
To unsubscribe from this group and stop receiving emails from it, send an email to materials-welding+unsubscribe@googlegroups.com.
To view this discussion on the web visit https://groups.google.com/d/msgid/materials-welding/CANii3RM-gS3HG5Dz4v0bu_S3oxxTKfgguSKgmvG9%3D5k8%3D%2BQ6Jw%40mail.gmail.com.

--
https://materials-welding.blogspot.com/
https://www.linkedin.com/groups/122787
---
You received this message because you are subscribed to the Google Groups "Materials & Welding" group.
To unsubscribe from this group and stop receiving emails from it, send an email to materials-welding+unsubscribe@googlegroups.com.
To view this discussion on the web visit https://groups.google.com/d/msgid/materials-welding/CADder3NJiZKT8D2ugsXu7z9O4OSDartr9UbP2o%3D_7jgwNd3wuw%40mail.gmail.com.

--
https://materials-welding.blogspot.com/
https://www.linkedin.com/groups/122787
---
You received this message because you are subscribed to the Google Groups "Materials & Welding" group.
To unsubscribe from this group and stop receiving emails from it, send an email to materials-welding+unsubscribe@googlegroups.com.
To view this discussion on the web visit https://groups.google.com/d/msgid/materials-welding/CAHdRSOPonduW7sM92SAZDyGR%3D2wpdjqbFYxFAnMjsg%3DX6Dpd0A%40mail.gmail.com.

Comments

Popular posts from this blog

Materails FAQs

Q: What are equivalents for standard Q 235 B (and Q 235 A) for U-channels? (asked by: boris.vielhaber@vait.com) A: DIN Nr. = 2393 T.2, 2394 T.2, EN 10025 W. Nr. DIN 17007 = 1.0038 Design DIN 17006 = RSt 37-2, S235JRG2 (Fe 360 B) Q: What is St DIN 2391 BK material? (asked by: dmcandrews@automaticstamp.com) A: Precision steel tubes, cold-finished/hard. Q: What is C.D.W. Boiler Tube? (asked by: montydude123@yahoo.com) A: Cold Drawn Welded Boiler Tube. Q: WHAT IS W.Nr. 1.4301? PLS TELL US IN EASY LANGUAGUE (asked...

[MW:36169] Cold Bending Qualification

Dear Experts,  Can anyone share the inspection requirements or a qualification procedure for cold bending? Our client spec states only the requirements for induction bending and would like to know your opinion on the cold bend inspection requirements. The code of construction is B31.3, Max. 5D bends, A106 SS 316L.  Thanks in Advance. -- https://materials-welding.blogspot.com/ https://www.linkedin.com/groups/122787 --- You received this message because you are subscribed to the Google Groups "Materials & Welding" group. To unsubscribe from this group and stop receiving emails from it, send an email to materials-welding+unsubscribe@googlegroups.com . To view this discussion visit https://groups.google.com/d/msgid/materials-welding/1be61cc3-e9c9-4a5f-834d-e8485e248432n%40googlegroups.com .

[MW:30043] Weep hole

If weep hole is not provided in dummy pipe before welding What will happen??? -- https://materials-welding.blogspot.com/ https://www.linkedin.com/groups/122787 --- You received this message because you are subscribed to the Google Groups "Materials & Welding" group. To unsubscribe from this group and stop receiving emails from it, send an email to materials-welding+unsubscribe@googlegroups.com . To view this discussion on the web visit https://groups.google.com/d/msgid/materials-welding/da251ee6-fa7f-4851-b876-cdb3834ae341%40googlegroups.com .