Dear sir / experts, 

I need help for welding a M.S. Pipe  with Mechanized FCAW Process for root pass to get good penetration for X-ray ( without backing strip & back gouging ) Wire, E71T-1. Dia, 1.2 mm.  Shielding  Gas,  100 % CO2.  Pipe  Dia  200mm. Wall Thickness 08.00mm. Welding  Position 1GR.

Please give me some guidelines  for above welding operation . Like,  voltage, Amps, and wire speed, travel speed, stick out,  torch angle, gas flow rate for root run  & other subsequent  run.

Few Engineers say that FCAW  are  not be recommended for open root run. They advised for  root  run  weld with GMAW process & subsequent run  by FCAW process. And I found in  ESAB Welder Guide Book . Page No. 16.  they are also  not recommended  root run  by FCAW.  on Pipe  &  Plate both.

My queries are as follows :

1.     Is it possible to weld a root run for X quality penetration  with  FCAW Process?

2.    There is any restriction for root  run welding  with FCAW   by any Welding Codes  like ASME Sec. IX, AWS D1.1. or  ISO 15614. ?

Thanks & Regards.

G. K. Banerjee.

Welder  Trainer.

NAGPUR. ( India )

M-09764555112. 09423632112.

--
http://www.linkedin.com/groups/MaterialsWelding-122787?home=&gid=122787&trk=anet_ug_hm
The views expressed/exchnaged in this group are members personel views and meant for educational purposes only, Users must take their own decisions w.r.t. applicable code/standard/contract documents.
---
You received this message because you are subscribed to the Google Groups "Materials & Welding" group.
To unsubscribe from this group and stop receiving emails from it, send an email to materials-welding+unsubscribe@googlegroups.com.
To post to this group, send email to materials-welding@googlegroups.com.
To view this discussion on the web visit https://groups.google.com/d/msgid/materials-welding/CAGhQL0%3DnDGJ5RRxMhwwPd1ksrOp8oomsL_w%3DQ%2Bi06z-KsdLdmA%40mail.gmail.com.
For more options, visit https://groups.google.com/d/optout.

Comments

Popular posts from this blog

Materails FAQs

Q: What are equivalents for standard Q 235 B (and Q 235 A) for U-channels? (asked by: boris.vielhaber@vait.com) A: DIN Nr. = 2393 T.2, 2394 T.2, EN 10025 W. Nr. DIN 17007 = 1.0038 Design DIN 17006 = RSt 37-2, S235JRG2 (Fe 360 B) Q: What is St DIN 2391 BK material? (asked by: dmcandrews@automaticstamp.com) A: Precision steel tubes, cold-finished/hard. Q: What is C.D.W. Boiler Tube? (asked by: montydude123@yahoo.com) A: Cold Drawn Welded Boiler Tube. Q: WHAT IS W.Nr. 1.4301? PLS TELL US IN EASY LANGUAGUE (asked...

[MW:36169] Cold Bending Qualification

Dear Experts,  Can anyone share the inspection requirements or a qualification procedure for cold bending? Our client spec states only the requirements for induction bending and would like to know your opinion on the cold bend inspection requirements. The code of construction is B31.3, Max. 5D bends, A106 SS 316L.  Thanks in Advance. -- https://materials-welding.blogspot.com/ https://www.linkedin.com/groups/122787 --- You received this message because you are subscribed to the Google Groups "Materials & Welding" group. To unsubscribe from this group and stop receiving emails from it, send an email to materials-welding+unsubscribe@googlegroups.com . To view this discussion visit https://groups.google.com/d/msgid/materials-welding/1be61cc3-e9c9-4a5f-834d-e8485e248432n%40googlegroups.com .

[MW:30043] Weep hole

If weep hole is not provided in dummy pipe before welding What will happen??? -- https://materials-welding.blogspot.com/ https://www.linkedin.com/groups/122787 --- You received this message because you are subscribed to the Google Groups "Materials & Welding" group. To unsubscribe from this group and stop receiving emails from it, send an email to materials-welding+unsubscribe@googlegroups.com . To view this discussion on the web visit https://groups.google.com/d/msgid/materials-welding/da251ee6-fa7f-4851-b876-cdb3834ae341%40googlegroups.com .