Dear,
Our project pipeline designed on ASME B 31.12. But client didn't mentioned which code we have to use for welding.
On 8 Sep 2015 16:36, "Raghuram Bathula" <raghurambathula@gmail.com> wrote:
-- --it depends on which subsection your piping falls into, either ASME IX or API 1104 to be usedOn 8 September 2015 at 18:03, waqas suleman <waqas.suleman@gmail.com> wrote:Dear Group Members,I need expert judgment about welding procedure requirement for code ASME B31.12 (Hydrogen Piping & Pipeline) and ASME B31.3 are same?Can i use a welding procedure which is qualified on ASME B31.3 code for Hydrogen piping & pipeline job too.Regards,Waqas SulemanMob. 00966 59 359 0798
You received this message because you are subscribed to the Google Groups "Materials & Welding" group.
To unsubscribe from this group and stop receiving emails from it, send an email to materials-welding+unsubscribe@googlegroups.com.
To post to this group, send email to materials-welding@googlegroups.com.
Visit this group at http://groups.google.com/group/materials-welding.
To view this discussion on the web visit https://groups.google.com/d/msgid/materials-welding/CADxVubk53V1SCne2fo7FWn%2BOr6uj-2kBdiX3XuStyZgwne7HWA%40mail.gmail.com.
For more options, visit https://groups.google.com/d/optout.
You received this message because you are subscribed to the Google Groups "Materials & Welding" group.
To unsubscribe from this group and stop receiving emails from it, send an email to materials-welding+unsubscribe@googlegroups.com.
To post to this group, send email to materials-welding@googlegroups.com.
Visit this group at http://groups.google.com/group/materials-welding.
To view this discussion on the web visit https://groups.google.com/d/msgid/materials-welding/CAKhANKjb8J5dFdgyRKEV%3DJL0et0rVkLjtpAOOwtksfpoSo%3Dn-w%40mail.gmail.com.
For more options, visit https://groups.google.com/d/optout.
No comments:
Post a Comment