[MW:15162] Regarding HIC TEST requrement FOR WET SOUR SERVICE

Dear Sir,

 

I need your Help regarding HIC Test required or Not

 

Ques: Shell & tube heat exchanger , KJO PROJECT,Saudi ARAMCO, IN Datasheet Notes points menstion as

 

1)all materials in wet,sour service shall be resistant to SSC & HIC and shall meet the requirment of MRO175/ISO15156

2)CORROSION /EROSION is due to H2S & CO2 Content are 0.115 mole% & 0.024 respectively

 

 

 

our service is Sour service , hot oil at shell side & wet crude tube side our material is SA516gr70

 

pls refer aramco spec rgarding wet sour , CAN U ELABORATE ME REGARDING HIC TEST REQ OR NOT

 

 

Aramco Spec 32-SAMSS-007

 

Wet Sour HIC Services: Hydrogen Induced Cracking (HIC) resistant steel qualified in

accordance with 01-SAMSS-016 shall be specified for the following environments with

normal operating temperatures between 0°C (32°F) and 150°C (302°F):

Sour water service with a hydrogen sulfide (H2S) concentration above

2 mg/L (2 ppm) and a total pressure of 450 KPa absolute (65 psia) or greater.

Hydrocarbon services meeting the definition of sour environments in SAES-A-301,

where the H2S concentration of 2 mg/L (2 ppm) or more in the water phase is equivalent

to H2S partial pressure of 0.05 psia.

A hydrocarbon system exposed to an environment with a H2S concentration above

50 mg/L (50 ppm) in the water phase, regardless of H2S partial pressure.

Commentary Note:

HIC resistant steel is not required in caustic services, lean amine systems and rich amine

DGA systems.

 

regards,

 

Shaikh Ahmed

Inspection

08082560014

 

 

--
To post to this group, send email to materials-welding@googlegroups.com
To unsubscribe from this group, send email to materials-welding+unsubscribe@googlegroups.com
For more options, visit this group's bolg at http://materials-welding.blogspot.com/
http://www.linkedin.com/groups/MaterialsWelding-122787?home=&gid=122787&trk=anet_ug_hm
 
The views expressed/exchnaged in this group are members personel views and meant for educational purposes only, Users must take their own decisions w.r.t. applicable code/standard/contract documents.
 
 

Comments

Popular posts from this blog

Materails FAQs

Q: What are equivalents for standard Q 235 B (and Q 235 A) for U-channels? (asked by: boris.vielhaber@vait.com) A: DIN Nr. = 2393 T.2, 2394 T.2, EN 10025 W. Nr. DIN 17007 = 1.0038 Design DIN 17006 = RSt 37-2, S235JRG2 (Fe 360 B) Q: What is St DIN 2391 BK material? (asked by: dmcandrews@automaticstamp.com) A: Precision steel tubes, cold-finished/hard. Q: What is C.D.W. Boiler Tube? (asked by: montydude123@yahoo.com) A: Cold Drawn Welded Boiler Tube. Q: WHAT IS W.Nr. 1.4301? PLS TELL US IN EASY LANGUAGUE (asked...

Heat tint (temper) colours on stainless steel surfaces heated in air // Heat tint

Introduction The colour formed when stainless steel is heated, either in a furnace application or in the heat affected zone of welds, is dependent on several factors that are related to the oxidation resistance of the steel. The heat tint or temper colour formed is caused by the progressive thickening of the surface oxide layer and so, as temperature is increased, the colours change.   Oxidation resistance of stainless steels However, there are several factors that affect the degree of colour change and so there is no a single table of colour and temperature that represents all cases. The colours formed can only be used as an indication of the temperature to which the steel has been heated. Factors affecting the heat tint colours formed Steel composition The chromium content is the most important single factor affecting oxidation resistance. The higher the chromium, the more heat resistant the steel and so the development of the heat tint colou...

Re: [MW:10788] ON PLOT PIPING & OFF PLOT PIPING

Piping systems involved for the flow lines and gathering lines from the well head isolation valve to the production facility or processing plant isolation valve are determined as OFF PLOT. ON PLOT defines piping system in the processing plant and production platform. ANSI/ASME B31.4 applies for off plot piping system. B31.4 allows the use of either API 1104 or ASME section IX (as appropriate). However, occasionally, a very small system such as piping within 500 feet of a processing plant (some client also said 400 feet) may be declared B31.3 rather than B31.4. When B31.3 is invoked, only ASME Section IX is used. before you decide which code to use for welding procedure and/or welder qualification for pipe welding, you have to know the design and construction code applicable to the system. Please read far enough into scope and diagram illustrating the application of either B31.3 and B31.4 hope this helps rgds 2011/4/21 pradip kumar sil < pradipsil@gmail.com > Dear all, ...