Re: Re: [MW:13143] Is it downcommers comes under saperate piping

Hi,

Yes.you can make MPDR for each Equipment final quality dossier including ABD All NDT reports NCR, waiver for test report, issuance of client inspection release note & prepration for shipment.
Once MDR completed no work done on job send equipment to site.


HEGADI.M.B.
QA/QC Manager
AL SAGHYIR BOILERS & PRESSURE VESSELS FACTORY CO. LTD.
2nd Industrial City | PO Box 122 |11383 | Riyadh, KSA
www.al-saghyir.net





On Sun, 04 Dec 2011 09:52:27 +0530 wrote
>Hi,Yes.you can make MPDR for eachEquipment/Itembefore send to site. and after welding you can make one MDR for total boilerThanks & Regards,

(Karthik)

Karthikeyan.S QA/QC Manager Getabec Energy Co.,Ltd. 379,Moo6,Soi8,Nikhomphatana, Rayong-21180, Thailand. Phone: 0066 38 897035-8 (Off) Fax: 0066 38 897034 Hand Phone: 0066 892512282
From: jagath kavali
To: Materials & Welding

Sent: Saturday, December 3, 2011 1:48 AM
Subject: [MW:13128] Is it downcommers comes under saperate piping


For code vessel boiler , stam drum, risers & downcommers are sending
saperately to the site , at site these equipments are joined by
welding we are making equipment wise MPDR (manufacturers partial data
report) it is enough or for each equipment MDR (manufaxturers data
report ) required. Please reply me.

--
To post to this group, send email to materials-welding@googlegroups.com
To unsubscribe from this group, send email to materials-welding+unsubscribe@googlegroups.com
For more options, visit this group's bolg at http://materials-welding.blogspot.com/
The views expressed/exchnaged in this group are members personel views and meant for educational purposes only, Users must take their own decisions w.r.t.
applicable code/standard/contract documents.






--
>
To post to this group, send email to materials-welding@googlegroups.com
>
To unsubscribe from this group, send email to materials-welding+unsubscribe@googlegroups.com
>
For more options, visit this group's bolg at http://materials-welding.blogspot.com/
>
The views expressed/exchnaged in this group are members personel views and meant for educational purposes only, Users must take their own decisions w.r.t. applicable code/standard/contract documents.
>
Follow Rediff Deal ho jaye! to get exciting offers in your city everyday.

--
To post to this group, send email to materials-welding@googlegroups.com
To unsubscribe from this group, send email to materials-welding+unsubscribe@googlegroups.com
For more options, visit this group's bolg at http://materials-welding.blogspot.com/
The views expressed/exchnaged in this group are members personel views and meant for educational purposes only, Users must take their own decisions w.r.t. applicable code/standard/contract documents.

No comments:

Re: [MW:35289] Welding consumable for S355J2WP material

S355 J2 WP  is a weathering structural steel  It has better atmospheric corrosion resistance. Use E 8018 - W1/W2  Electrodes This is regular...