Skip to main content

RE: [MW:6800] wrong holes on header closed by welding-reg

01.The holes closed is a right method?

If you have made a proper bevel and welded with GTAW root, could not be a problem.

02.what will be the strength in future working conditions?

You may provide an additional pad plate on top of it, best alternative could be if space permits provide a nozzle with blind flange.

03.what will be the suitable inspection method at this condition?

Check with remote visual (e.g. video scope) for full penetration. if you are not sure of weld quality better to remove cap, inspect the patch  and re weld the cap.

04.finally ,can accept this or not?

Acceptance and salvage depends on your construction code and client’s./ AI’s acceptance.

 

From: materials-welding@googlegroups.com [mailto:materials-welding@googlegroups.com] On Behalf Of Karthik
Sent: Tuesday, August 31, 2010 2:51 PM
To: materials-welding@googlegroups.com
Subject: [MW:6799] wrong holes on header closed by welding-reg

 


Dear all,

in our current job of prefurnace,holes(2 nos.on end of the both side of header) specified in the drawing was wrong.But it was found only after the holes were drilled.

Specification of header pipe as follows.

Material - A106 Gr.B

Dia - 6"

Thk. - 7.11mm

Hole dia - 74

Design Pressure - 16bar

MAWT - 190degree celsius

After that,it was noticed to our engineering departmmment and they revised the drawing and asked our production to close the wrong holes by attach the same grade of material and weld.Now the repair has finished as said above.

But on this hole closed area, we cannot do UT (because of thickness limitation) also RT cannot be done because of the adjacent tubes and elbows.Even we cannot see the penetration of the weld due to endplates were closed on both sides.just we did PT only and there is no defects.

Pls.give your suggestion on the below questions.

 

01.The holes closed is a right method?

02.what will be the strength in future working conditions?

03.what will be the suitable inspection method at this condition?

04.finally ,can accept this or not?

 

Thanks & Regards,

 

(Karthik)

 

Karthikeyan.S

QA/QC Manager

Getabec Energy Co.,Ltd.

379,Moo6,Soi8,Nikhomphatana,

Rayong-21180,

Thailand.

Phone: 0066 38 897035-8 (Off)

Fax: 0066 38 897034

Hand Phone: 0066 892512282

 


Comments

Popular posts from this blog

Materails FAQs

Q: What are equivalents for standard Q 235 B (and Q 235 A) for U-channels? (asked by: boris.vielhaber@vait.com) A: DIN Nr. = 2393 T.2, 2394 T.2, EN 10025 W. Nr. DIN 17007 = 1.0038 Design DIN 17006 = RSt 37-2, S235JRG2 (Fe 360 B) Q: What is St DIN 2391 BK material? (asked by: dmcandrews@automaticstamp.com) A: Precision steel tubes, cold-finished/hard. Q: What is C.D.W. Boiler Tube? (asked by: montydude123@yahoo.com) A: Cold Drawn Welded Boiler Tube. Q: WHAT IS W.Nr. 1.4301? PLS TELL US IN EASY LANGUAGUE (asked...

Heat tint (temper) colours on stainless steel surfaces heated in air // Heat tint

Introduction The colour formed when stainless steel is heated, either in a furnace application or in the heat affected zone of welds, is dependent on several factors that are related to the oxidation resistance of the steel. The heat tint or temper colour formed is caused by the progressive thickening of the surface oxide layer and so, as temperature is increased, the colours change.   Oxidation resistance of stainless steels However, there are several factors that affect the degree of colour change and so there is no a single table of colour and temperature that represents all cases. The colours formed can only be used as an indication of the temperature to which the steel has been heated. Factors affecting the heat tint colours formed Steel composition The chromium content is the most important single factor affecting oxidation resistance. The higher the chromium, the more heat resistant the steel and so the development of the heat tint colou...

Re: [MW:10788] ON PLOT PIPING & OFF PLOT PIPING

Piping systems involved for the flow lines and gathering lines from the well head isolation valve to the production facility or processing plant isolation valve are determined as OFF PLOT. ON PLOT defines piping system in the processing plant and production platform. ANSI/ASME B31.4 applies for off plot piping system. B31.4 allows the use of either API 1104 or ASME section IX (as appropriate). However, occasionally, a very small system such as piping within 500 feet of a processing plant (some client also said 400 feet) may be declared B31.3 rather than B31.4. When B31.3 is invoked, only ASME Section IX is used. before you decide which code to use for welding procedure and/or welder qualification for pipe welding, you have to know the design and construction code applicable to the system. Please read far enough into scope and diagram illustrating the application of either B31.3 and B31.4 hope this helps rgds 2011/4/21 pradip kumar sil < pradipsil@gmail.com > Dear all, ...