Tuesday, January 12, 2010

[MW:4024] Pre qualified WPS for STR Steel

Dear Members,

I want to prepare the Pre-qualified procedure (code AWS D1.1)for fabrication of structural steel. In our project we have WPS/PQR for piping. Please gudie me how to prepare the pre-qualified WPS abased on piping PQR and send sample Di.1 WPS format in editable or workable format.

--
With Regards,

Mohan, Q8.

No comments:

[MW:34920] Tubesheet Hole step

Hello Team, I have one question any tolerance given for tubesheet Hole step. Please do needful. Regards, AP  -- https://materials-...