Friday, January 6, 2012

Re: [MW:13427] under ground pipeline leak testing method during hydro test

Underground lines shall be hydro tested for a time duration of min 24 hrs by using pressure and temperature recorders so that any drop in pressure if noted can be evaluated if its due to temperature variation or due to leakage, this should be a procedure accepted with agreement of the client.

Regards

On Thu, Jan 5, 2012 at 2:49 PM, mohd.qce <mohd52100@gmail.com> wrote:
Dear experts,

Can any one give good and efficient method of underground(buried) pipe
line leak testing method during hydrotest?

Pipe:        API 5L Gr 52 MS PSL-2.
Length :    Two section 50km+50km (2500 joints approx each section).
Test pressure : 73.25 bar.

--
To post to this group, send email to materials-welding@googlegroups.com
To unsubscribe from this group, send email to materials-welding+unsubscribe@googlegroups.com
For more options, visit this group's bolg at http://materials-welding.blogspot.com/
The views expressed/exchnaged in this group are members personel views and meant for educational purposes only, Users must take their own decisions w.r.t. applicable code/standard/contract documents.

--
To post to this group, send email to materials-welding@googlegroups.com
To unsubscribe from this group, send email to materials-welding+unsubscribe@googlegroups.com
For more options, visit this group's bolg at http://materials-welding.blogspot.com/
The views expressed/exchnaged in this group are members personel views and meant for educational purposes only, Users must take their own decisions w.r.t. applicable code/standard/contract documents.

No comments:

[MW:34916] Applicability of Impact requirement as per ASME B31.3

Dear All, Design code – ASME B31.3, Welding Code- ASME BPVC SEC IX Material  to be used used during Fabrication - SA 333Gr6 (P No.1 G...